Laserfiche WebLink
09/14/00 THU 11 03 FAX 1 916 861 0430 SECOR—SACRAMENTO x]015 <br /> PROTECT BUDGET FOR Datc 14-Sep-00 <br /> WELL HEAD TREATMENT SYSTEM INSTALLATION Projcct Number pending <br /> RANCH MARIS.irT SITE Project Manager ]off Auchterlonrc <br /> 23569 SANTA FE ROAD Ftle RiverBank/Budget/RB-WeIlHeadfrear-,1 wk4 <br /> RIVERBANK.CALIFORNIA <br /> 71 "Rafte` 1VIatka <br /> 001' 'VV0RIGq AW& T IN6 ' r <br /> (Ptopsm and eubmii workplan and design plans for well repair and well head ircamtem system) <br /> (Obtain well worknver and rtcpalr permiu from San Joaquin County Environmental Health) <br /> Work Plan $2,39500 <br /> Registered Geologist 3 hours $10500 $31500 <br /> Registered)Engineer 6 hours $8500 $51000 <br /> Associate Geologist 6 hours $8500 $51000 <br /> Staff Geologist II 8 hours $7500 $60000 <br /> Drafter II 8 hours $5000 $40000 <br /> Administrator II 1 hours $5000 $5000 <br /> Permitting-Well Repair SICEHD $35000 <br /> Staff Geologist 5 hours $7000 S35000 <br /> Permit Fees $5750 <br /> SJAPCD Pump Pertrut Fee 1 parcels $5000 15% $5750 <br /> SJPWD Permit Fee 0 fee $000 15% $000 <br /> Electncal Permit Fee 0 fee $0 04 15% $000 <br /> t , �' l � � u 1I 1 1u,i r,m <br /> , „o,0 , " j, j� 4' nem,: WL- REP** u 1 I 1 $12,2041 <br /> 5 <br /> (Includes scheduling coordination,subcontractor costs and Feld hbor to overzee swabbing well and installation of sleeve in well DW 2) <br /> (Work over will include the following scope of work <br /> 1) Swab cleanout,and redevelop well DW I (Field days 1) <br /> 2) Install 4'Diameter inner blank casing From Snide to 45 Feet bgs and tereen front 45 to 60 feet bgs (NOT FEASIBLE) <br /> Annual space will be scaled fmm Bade to 45 Feet using bentenile and ne8t cerna i <br /> 3) Develop well,disinfect,and Install new primp that can pump water at 10 gpm (Field days 1) <br /> (Assume condition of well casing will allow for development and installation of inner cnsmg) <br /> (All watts purged from tank will be retained in 2 400 gallon water storage tank comic ) <br /> (When rhe carbon water treatment system has been installed the water will be run tbrough treatment system and discharged to stock tank) <br /> Coordination&Scheduhng $1.27000 <br /> Registered Geologist 4 hours $10500 $42000 <br /> Associate Geologist 10 hours $8500 $85000 <br /> Weil ork Over-Fleld Labor $1,89000 <br /> Staff Geologist(Travel time) 24 hours $7000 $1,69000 <br /> Staff Geologist(Site erne) 3 hours $7000 $21000 <br /> Subcontractors Costs $8,52150 <br /> Well Work Over 10 hours $12000 15% $1,38000 <br /> Inner Sleeve Installation (NOTFEASIBLE) 1 bid $000 15% $000 <br /> p'utnp&Controls Installation 1 bid $5,00000 15% $5,75000 <br /> 2,400 gallon storage tank-Mob/Demob 1 bid $70000 Is% $80500 <br /> 2,400 gallon storage tank-30 days 30 days $1700 15% $58650 <br /> Otbe <br /> q Dlrcet Charges- $44225 <br /> SECOR Field Trek 2 tray $7500 $15000 <br /> PiD Rental 2 day $6500 513000 <br /> water Level Indicator 2 day $1500 $3000 <br /> Miscellaneous Expenses 2 day $2000 15% $4600 <br /> Per Diem 1 night $7500 15% $8625 <br /> LnbMtory Fees Water Samules $8050 <br /> �BTEX,T Hg,&M'T13E(EPA 8260B) 1 samples $5000 15% $5750 <br /> Nitrates 1 samples $2000 15% $2300 <br /> I <br /> File R,mch MndkeilBudgcEaB-WellHcadTreat-i xis Page 1 of 3 <br />