Laserfiche WebLink
41 CuStar NOP-STK-13 <br /> STOCKTON REV-3 <br /> 04/30/2020 <br /> BP Pre-Load Draining Procedure <br /> BP Pre-Load Draining Procedure NOP-STK- 13 <br /> Approval: <br /> Date: <br /> Stockton Terminal Manager <br /> Administrator: <br /> Date: <br /> Stockton Terminal Operator <br /> Revision/Review Log <br /> Date Revision/Review Printed Name & <br /> Initial <br /> 05/15/14 Drafted & Revised to reflect the draining of Ed Vegas EJV <br /> retain product <br /> 5/19/2015 Reviewed by Operations Ray Smith <br /> 3/1/2016 Annual Review Operations <br /> 1/24/2017 Annual Review Operations <br /> 11/29/2018 Annual Review Operations <br /> 4/17/2019 Updated language in caution box on page 4. Safety Charter <br /> Added lane 3 and 4 flammable cabinet. Cell <br /> phone use 50' from loading area. <br /> 4/30/2020 Annual Review Safety Charter <br /> 1 of 5 <br />