2. SCOPE OF WORK <br /> CKG will contract with Cascade Drilling,a C57 licensed drilling contractor to install the new MW- <br /> 4m(MW-4R)at its present location. The following bullets outline the elements necessary to complete <br /> the proposed work: <br /> • Obtain a SJDEH Permit for the well installation <br /> • Prepare a site-specific health and safety plan for the work. <br /> • Mobilize to the site to install the monitoring well. <br /> • Develop and survey the monitoring well. <br /> The following is a task breakdown of CKG's scope of work. <br /> Task 1 —Permitting <br /> The SJDEH requires submittal of their"Site Mitigation Well and Boring Permit Application". <br /> Supporting documents required with the permit applications include a site-specific health and safety <br /> plan;their"Site Mitigation Master File Record Information Form"and this work plan,approved by <br /> the RWQCB. Copies of these document are provided in Appendix A. <br /> Task 2—Health and Safety Plan <br /> A health and safety plan will be prepared prior to initiating fieldwork.The health and safety plan will <br /> list potential hazards and protective measures required to protect the field investigation team,other <br /> persons on site,and the general public from site specific hazards(Appendix A). <br /> Task 3-Subsurface Utility Clearance <br /> Because the new MW4R will be installed in the same borehole as the old MW-4,it will not be <br /> necessary to clear the borehole for subsurface utilities. <br /> Task 4 Well Installation <br /> CKG will work with Cascade Drilling to install the new MW-4R to a depth of 85 feet which is <br /> approximately 15 feet deeper that the existing MW-5.The well will be constructed through 10 or 12- <br /> inch diameter hollow stem augurs.The well will be constructed of 4-inch diameter schedule 40 PVC <br /> with 25 feet of 0.02-inch screen from 60-85 feet below ground surface. CKG is proposing a 25-foot <br /> screen because water elevation fluctuates widely at this part of the property. <br /> Cascade Drilling will start by removing the flush mounted well head and drilling out the existing well. <br /> After all the well debris is cleared from the borehole the drillers will advance the hole to the new depth <br /> of 85 feet below ground surface. CKG Environmental,Inc.will log soil lithology from the deeper <br /> section of the well. Construction details for MW-4R are described on Plate 3. <br /> CKG Environmental,Inc. Page 2 June 4,2020 <br /> Well Installation Work Plan,MW-4R Owens-Brockway Tracy CA <br />