Laserfiche WebLink
5.2.2 Implementability <br /> Alternative 2 will be relatively easy to implement even though initial site procedures are intrusive. Initial site <br /> ` activities will likely only require two days of drilling work and another day for well development. <br /> Alternative 2 will then be easy to implement as it essentially continues current monitoring work being <br /> ` performed at the site. Implementation ofAltemative 2 will additionallyrequire review ofthe site information <br /> to determine if the site is then eligible for low risk site closure of if further action at the site is warranted. <br /> ► 5.2.3 Cost <br /> The overall cost ofAltemative 2 was estimated to be$58,250,including conducting the vertical extent <br /> ` groundwater investigation and installing the new well in the source area,installing the new downgradient <br /> monitoring well,redeveloping MW-2,surveying the network ofmonitoring wells,conducting one year of <br /> quarterly monitoring,and compiling the site information into a low risk site closure request,which will be <br /> performed during the year following the data gaps sampling plan. The detailed cost breakdown for <br /> Alternative 2 is presented in Appendix A, Table A-2. <br /> • <br /> • <br /> • <br /> r <br /> • <br /> V <br /> • <br /> • <br /> 19 <br /> • <br />