My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010362
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:35:16 PM
Creation date
5/18/2020 2:56:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010362
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly groundwater sampling has been conducted since 1996. This report is the third quarter 2001 <br /> groundwater monitoring report which represents the first report in the Phase IX groundwater sampling effort <br /> and presents the results of continued groundwater sampling following the schedule presented in Table 1-1. <br /> Table 1-1 <br /> Sampling Schedule t <br /> i <br /> U <br /> Quarter Monitor Wells to be Sampled <br />— -2 MW-2A and MW-9 <br /> MW , M 9 <br /> Second MW-2,MW-2A,MW-3A, MW-4,MW-6,MW-7 and MW-9 ' <br /> Third MW-2, MW-2A and MW-9 i <br /> Fourth MW-2, MW-2A,MW-3A, MW-4, MW-5,MW-6,MW-7, and MW-9 j <br /> 2.0 FIELD SAMPLING SUMMARY <br /> Groundwater samples were collected from monitor wells MW-2, MW-2A, and MW-9 (Figure I-I) on <br /> k <br /> October 11, 2001. In addition, the holding tank was sampled and an equipment blank was collected. <br /> Groundwater sampling data sheets for the monitor wells are presented in Appendix B. <br /> -� Water levels in all wells were measured on October 11, 2001. The standing water volumes within wells <br /> scheduled for sampling were calculated using water levels measured in each well at the time of sampling and <br /> total well depths. A submersible pump was used to purge three well casing volumes from each of the <br /> monitor wells. <br /> At the beginning and during the purge process,the temperature,pH, and specific conductance of the purge <br /> r water were measured. This information was recorded on a sampling data sheet. Groundwater samples for <br /> benzene,toluene,ethylbenzene,and xylene(BTEX)and for total petroleum hydrocarbons as gasoline(TPH- <br /> G) analysis were collected from the wells with a disposable bailer and nylon string. The groundwater <br /> samples were transferred into 40 ml glass sample containers. Sample containers were checked for air <br /> bubbles. The sample containers were sealed in a plastic bag,placed with ice in an insulated chest,and logged <br /> on a chain-of-custody form for delivery to the analytical laboratory. x <br /> The pump used to purge and sample the wells was thoroughly cleaned prior to each use by placing it into a <br /> container oftap water and washing the outside of the pump. The disposable hose was discarded after purging <br /> each well. <br /> r � <br /> Purge water from monitor well MW-9 was stored in a holding tank located at 222 E.Weber Avenue. When <br /> full,the water in this tank will be sampled and,if acceptable,will be discharged to the sanitary sewer under <br /> �- a permit from the City of Stockton Department of Municipal Utilities. Purge water from MW-2 and MW-2A <br /> y <br /> LSPROJFM\SANJOQ\HSA51Q01RPT.WPD 2 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.