Laserfiche WebLink
a <br /> �W3ER5 oEsrllxr+ws <br /> and the San Joaquin County Public Health Services Environmental Health Division (EHD)agreed <br /> that one year of quarterly groundwater monitoring would be performed (Table 1-1) It was also <br /> Iagreed that a corrective action plan (CAP) would be prepared following the completion of one <br /> year of quarterly groundwater monitoring (Roy F Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996) The Phase IV investigation <br /> and first round of groundwater sampling confirmed that soil contamination is present in the <br /> vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br /> iformer USTs The fourth quarter of Phase IV groundwater sampling was completed in May 1997 <br /> The CAP was submitted to EHD in January 1998 <br /> This report is h <br /> p the first quarter 2000 groundwater monitoring report which represents the third <br /> report in the Phase VII groundwater sampling effort and presents the results of continued <br /> groundwater sampling following the schedule presented in Table 1-1. <br /> I <br /> Table 1-1 <br /> ISampling Schedule <br /> F[ Quarter A Monitor Wells to be Sampled <br /> First MW-2, MW-2A and MW-9 <br /> Second MW-2, MW-2A, MW-3A, MW-4, MW-6, MW-7 and MW-9 <br /> Third MW-2, MW-2A and MW-9 <br /> Fourth MW-2, MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br /> I <br /> I <br /> I ' <br /> I <br /> L%PROJECPS%SANj(>Q1HSA11Q9WPr TATO 2 <br /> I <br />