My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010373
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:43:07 PM
Creation date
5/18/2020 3:00:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010373
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />' WWAGEIIS GFSNiEASGViAlTNRS <br /> agreed that one year of quarterly groundwater monitoring would be performed (Table 1-1). It <br /> was also agreed that a corrective action plan (CAP) would be prepared following the completion <br />' of one year of quarterly groundwater monitoring (Roy F. Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996). The Phase IV investigation <br />' and first round of groundwater sampling confirmed that soil contamination is present in the <br /> vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br />' former USTs The fourth quarter of groundwater sampling was completed in May 1997 The <br /> CAP was submitted to EHD in January 1998. <br />' This report is the fourth quarter groundwater monitoring report for calendar year 199$ and <br /> presents the results of continued groundwater sampling following the schedule presented in Table <br />' 1-1, given that San Joaquin County 1s on a fiscal year schedule that begins July 1. <br /> Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2A and MW-9 <br /> Second MW-2A, MW-3A, MW-4, MW-6, MW-7, and MW-9 <br /> Third MW-2A and MW-9 <br /> Fourth MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br /> L 1PR0JECf'SISANJOQI1iSA%SA_99 JAN 3 Unua9'19" <br />
The URL can be used to link to this page
Your browser does not support the video tag.