Laserfiche WebLink
HAMMERS OESIf.NERSTpy}LINTS • <br /> TABLE OF CONTENTS <br />' Sectio n Title Page <br /> I <br />' 10 INTRODUCTION 1 <br /> 1 1 SITE BACKGROUND 1 <br /> 1 2 SCOPE OF WORK . 2 <br /> I <br /> 20 FIELD INVESTIGATION . . 3 <br />' 2.1 PERMITS AND NOTIFICATION 3 <br /> 2.2 UTILITY CLEARANCE 3 <br /> 2.3 PHASE IV INVESTIGATION PROCEDURES 3 <br />' 2 3.1 Monitor Well Installation 3 <br /> 2 3 2 Soil Boring - 4 <br /> 24 QUARTERLY GROUNDWATER MONITORING SAMPLING <br /> PROCEDURES . . 6 <br /> 2.5 ANALYTICAL METHODS . . 7 <br />' 2.5 1 Soil Analysis . . - • : - • : 7 <br /> 2.5 2 Groundwater Analysis 7 <br /> 2.6 SITE HEALTH AND SAFETY . . . . . 7 <br /> 3 0Q UALITY ASSURANCE PLAN S <br /> 3.1 DECONTAMINATION PROCEDURES . . . . S <br /> 32 WASTE HANDLING . . . . S <br /> 33 SAMPLE LABELING AND HANDLING 8 <br />' 3.3 1 Sample Containers • - 8 <br /> 3.3 2 Sample Identification 8 <br /> 3.3 3 Sample Custody, Packaging, and Shipping . . 9 <br /> 34 QUALITY CONTROL SAMPLES 9 <br /> 35 DOCUMENTATION 9 <br /> 40 REPORT PREPARATION . . . . 10 <br /> IFigure 1 Proposed Soil Boring and Monitor Well Locations . . . . 4 <br /> I <br /> • <br />