Laserfiche WebLink
AwNGER$ ESGNEFS+CONSLtINAS <br /> sleeves. All samples will be screened in the field using a photoaonazataon detector (PID). If <br />' floating product is present within the hollow stem auger, an attempt will be made to remove the <br /> product by bailing or absorbing it prior to sampling One soil sample collected below the water <br /> table and two soil samples collected above the water table will be submitted for laboratory <br /> ianalysis Samples submitted for analysis will be chosen based on PID, visual, and olfactory <br /> observations. <br />' The brass liners containing samples for chemical analysis will be capped with Teflon''" sheeting <br /> L and plastic caps The samples will be placed in plastic bags and stored on ice at a temperature <br /> of approximately 4°C for transport to an analytical laboratory A thermometer will be kept in <br /> the cooler to confirm the temperature of the samples The remaining soil will be described <br />' following the Unified Soil Classification System (USCS) under the direction of a California <br /> Registered Geologist <br />' A grab groundwater sample will be collected with a Hydropunch''' or equivalent system at <br />' approximately 55 ft bgs A clean stainless steel bailer will be used to collect the samples. The <br /> grab groundwater water sample will be placed in the appropriate sample container (see Section <br /> 3 3 1). Care will be taken to prevent air bubbles from forming an the 40 ml sample containers <br /> for volatile analysis The sample will be sealed an a plastic bag and stored on ice at temperature <br /> of approximately 4°C for transport to the analytical laboratory <br /> After the soil boring is completed the borehole will be backfilled with pea gravel or sand from <br /> 45 ft to 60 ft bgs to prevent grout from intruding the aquifer and disrupting monitor well MW- <br /> 2A If pea gravel as used, approximately 3 feet of sand will be placed on top of the pea gravel <br /> to minimize the potential for bentonite to enter the gravel Approximately 5 feet of bentonite <br /> pellets or chips will be placed on top of the sand After the bentonite has hydrated, the borehole <br /> will be backfilled to the surface with a bentonite/cement grout The concrete sidewalk will be <br /> patched with concrete <br /> 2.4 QUARTERLY GROUNDWATER MONITORINQ SAMPLING PROCEDURES <br /> Groundwater monitor wells will be sampled quarterly according to the schedule contained in <br /> Section 1 2. Prior to each sampling event a complete round of water levels will be collected. <br /> Each well to be sampled will be purged of three to five casing volumes with either a Teflon' <br /> Ibailer or a submersible pump During purging, the pH, temperature, and electrical conductivity <br /> of the groundwater will be measured Groundwater samples will be collected using a clean <br /> nylon line and Teflon' bailer The groundwater water sample will be placed in the appropriate <br /> LIPROJECCszANJoQWSAWP 6 <br />