Laserfiche WebLink
LLNL-AR-788093 <br /> External <br /> SUMMARY PROGRESS REPORT <br /> TABLE 2: SPECIFIC WASTE STREAM INFORMATION DATE: 9/1/2019 <br /> Complete and submit a separate Table 2 for each major hazardous waste stream. <br /> Complete and submit a separate Table 2 for each minor hazardous waste stream for which a source reduction measure was selected. <br /> IDENTIFICATION <br /> (19) NAME OF GENERATOR, FACILITY, or BUSINESS (20) EPA ID NO. <br /> Lawrence Livermore National Laboratory CA2890012584 <br /> (21) HAZARDOUS WASTE STREAM DESCRIPTION <br /> chemical reduction inventory efforts including lab cleanouts and (22)CALIFORNIA WASTE CODE <br /> disposal of off-specification chemicals, typically from previous <br /> research activities. CWC: 791 <br /> (23) THIS HAZARDOUS WASTE IS (please check one): <br /> Processed onsite in a wastewater pretreatment unit for discharge to POTW or NPDES permit(Category A) <br /> Other SB 14 hazardous waste(Category B) <br /> X Extremely hazardous waste <br /> ACCOMPLISHMENTS <br /> Your 2014 SB 14 Plan, Performance Report,or Compliance Checklist,has this information. <br /> (24) Provide the following information for this waste stream: <br /> How much waste was generated in the 2014 Reporting YE 63 pounds <br /> Describe the source reduction measure(s) implemented since 2010 (add pa e if needed): <br /> This waste is generated from various chemical reduction inventory efforts including lab <br /> cleanouts and disposal of off-specification chemicals, typically from previous research <br /> activities. LLNL conducted less lab cleanout operations in 2018. <br /> Estimate when this source reduction measure was impler N/A Month Year <br /> For this measure, what source reduction quantity was <br /> projected in the 2014 Plan: N/A pounds per year <br /> Estimate the quantity of waste reduced annually by this <br /> measure since implementation: N/A pounds per year <br /> (See Summary Progress Report publication or SB 14 Guidance Manual Chapter 6,to help estimate hazardous waste reduced.) <br /> PROJECTIONS <br /> Your 2018 SB 14 Plan or Compliance Checklist has this information. <br /> (25) Provide the following information for this waste stre< <br /> How much waste was generated in the 2018 Reporting Yf 73 pounds <br /> Describe the source reduction measure selected to be implemented by 2018: (add page if need <br /> In early 2019, it was discovered that vanadium was a better choice for the goal of the project <br /> as well as a safer and less hazardous alternative material. The project now utilizes vanadium <br /> solutions (dissolved IV sulfate oxide hydrate in aqueous solution of sulfuric acid). LLNL plans <br /> to continue existing best management practices to minimize this waste stream. <br /> Estimate when this source reduction measure will be implemented: N/A Month Year <br /> What is the annual projected source reduction quantity <br /> identified in the 2018 Plan? N/A pounds per year <br /> *Since the information required for Table 2 is waste stream specific,a separate Table 2 must be <br /> completed for each Major waste stream.Add additional waste streams by clicking on the "Table 2-1" <br /> through "Table 2-10 "tabs at the bottom as necessary. <br /> ESH-EFA-P2S-19-16592 <br />