My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:31:06 PM
Creation date
5/18/2020 3:13:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gary A. Reents 7 14 April 1989 <br /> be provided in the Beneficial Use Analysis and Remedial Action <br /> Plan. <br /> 9 . We recommend that an additional deep monitoring well be <br /> installed within the area containing the highest shallow zone <br /> levels of TDS. Southwest Hide should respond to this <br /> recommendation, in writing, by 1 May 1989 . If this well or any <br /> monitoring well is installed within a contaminated area, a <br /> detail of the proposed monitoring well design should be <br /> submitted for review prior to the drilling of the well. <br /> 10 . The discussion, in the report, on the current impact of the <br /> beneficial uses of the aquifer should be elaborated upon within <br /> the Beneficial Use Analysis and Ground Water Remedial Action <br /> Plan required in the Cleanup and Abatement Order and scheduled <br /> for submittal by 1 August 1989 . <br /> 11. Section 8 of the report states that the two old production wells <br /> on the Southwest Hide property should be investigated to <br /> determine if they are acting as conduits to deeper zones. <br /> Southwest Hide should submit a work plan on how these old <br /> production wells will be investigated by 1 May 1989 . <br /> 12 . A work plan describing the details of the proposed pump test <br /> must be submitted, for review, by 1 May 1989. <br />
The URL can be used to link to this page
Your browser does not support the video tag.