Laserfiche WebLink
Photo 1 -0803 <br /> The first boring of the day (B-3) was <br /> installed on the south berm of the <br /> irrigation ditch(left). Just out of view to <br /> the right is the west hangar. The loading <br /> dock is partially visible just right of the <br /> control panel. <br /> i <br /> Photo 2—0941 <br /> i A soil sample is being collected from B-4 <br /> fi at a point on the berm near the washout <br /> pit. <br /> Photo 3—0942 <br /> Drilling tools and sampling equipment <br /> -� was steam cleaned using equipment <br /> mounted on the support trailer. <br /> a h <br /> 1 j ate <br /> . i <br /> it <br />