My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PARADISE
>
21000
>
2900 - Site Mitigation Program
>
PR0524567
>
COMPLIANCE INFO_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:48:34 PM
Creation date
5/18/2020 3:14:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
CASE 2
RECORD_ID
PR0524567
PE
2950
FACILITY_ID
FA0016478
FACILITY_NAME
FORMER HALEYS FLYING SERVICE
STREET_NUMBER
21000
STREET_NAME
PARADISE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
21000 PARADISE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan—PEA Page 7 <br /> Former Haley Flying Service <br /> GPE Project 474.2 <br /> monitored on a quarterly basis until it is determined that some other monitoring schedule is <br /> appropriate. <br /> The groundwater samples from each well will be submitted to Severn Trent Laboratories of <br /> Pleasanton and tested for the presence of organo-chlorine pesticides by EPA method 8081 B <br /> and such other tests as may be deemed appropriate. <br /> 2.9 Waste Disposal <br /> Decon water will be containerized in an appropriate DOT container drum for later recycling <br /> by a licensed hazardous waste hauler. No soil cuttings will be generated during the Geo- <br /> Probe drilling process. Approximately five drums of soil cuttings generated during the <br /> hollow stem auger drilling process will be profiled to determine the appropriate disposal <br /> method. If the soil is determined to contain pesticides, it will be stockpiled on the site to be <br /> treated along with the pesticide-impacted shallow soil. <br /> 2.10 Documentation <br /> Field documentation procedures are described in the original Work Plan. <br /> 2.11 Quality Assurance / Quality Control <br /> See Section 2.2 of the original Work Plan for a general discussion of QA/QC methods and <br /> protocols. <br /> For the work described in this addendum, a trip blank prepared by the analytical laboratory <br /> will accompany the sample storage containers throughout the sample collection process, and <br /> will be returned to the lab for analysis along with the water samples collected in the field. An <br /> equipment blank will be collected in the field prior to collecting the final groundwater <br /> sample. A split replicate of one of the groundwater samples will be tested using the same <br /> procedures as the other samples. <br /> 2.12 Health and Safety Plan <br /> See Appendix A of the original Work Plan for the Health and Safety Plan. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.