Laserfiche WebLink
PEA Work Plan Addendum Page 2 <br /> Former Haley Flying Service <br /> GPE Project 474.2 <br /> 2.0 DATA COLLECTION <br /> This section describes the rationale and methods that will be used to obtain the samples and <br /> laboratory analytical information to be used in the completion of an addendum to the PEA. <br /> 2.1 Field Work <br /> Groundwater samples will be collected at six specific points on the subject site. Three points <br /> will be from borings to be installed through the south berm of an irrigation ditch that marks <br /> the north line of the site. Other borings will be located south, east and west of the <br /> contaminated area. The domestic water well will also be sampled, making a total of seven <br /> groundwater samples to be collected. <br /> 2.2 Sampling Strategy <br /> The regional direction of groundwater flow in this area is in a northerly direction, although <br /> the precise local direction of flow has not been determined. In an attempt to obtain <br /> representative groundwater samples in the down-gradient position, three of the borings will <br /> be installed on the south berm of the irrigation ditch. These positions will be northwest, <br /> north, and northeast of the area of the most intense pesticide contamination. These locations <br /> are also unlikely to exhibit high concentrations of pesticides in the soil, thus minimizing the <br /> risk of cross-contamination. To assure that a suitable groundwater sample has been obtained <br /> regardless of the actual direction of groundwater flow, additional borings will be installed <br /> south, east, and west of the area of major contamination, but at points sufficiently distant that <br /> shallow soil contamination will be minimal. <br /> The Geo-Probe soil borings (designated B-3 to B-8) will be advanced to a depth sufficient to <br /> penetrate the groundwater surface, and a sample of the shallow groundwater will be collected <br /> from each of these borings. In addition, a sample will be collected from the onsite domestic <br /> water production well. <br /> 2.3 Groundwater Sampling and Analysis <br /> Prior to installing the proposed soil borings, the required drilling permit will be obtained <br /> from the San Joaquin County Environmental Health Department. The Geo-Probe soil <br /> borings will be drilled using 1.5" outside diameter Geo-Probe drilling equipment owned and <br /> operated by RSI Drilling of Woodland, CA, a C-57 Licensed drilling contractor. The borings <br /> will be advanced to a depth sufficient to penetrate the groundwater surface (est. about 11 feet <br /> below grade). The domestic water well and borings B-3 through B-8 are shown on the <br /> detailed site sketch map (Figure 2). <br /> See the original Work Plan for information regarding soil boring and sampling procedures. <br /> After collecting the final soil sample and a groundwater sample, each boring will be filled to <br /> grade with Class G neat cement. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />