Laserfiche WebLink
Table 3 <br /> Ancillary Equipment Information <br /> Stockton Plck-n-Pull <br /> It..DescOption Service Manufacturer Specification Location Secondary Containment <br /> Oil Filter Crusher Gravity Lisle Steel Tanks 01&02 Ddp pan and concrete <br /> Drain Bullding flooring <br /> Tank Drilling Machine Gravity/Pneumatic $EDA Steel Diesel Buggy Concrete floe, <br /> Pump Drain building <br /> Level GaugeB Customer drop-off Double-walled/Concrete <br /> Overfill Shot-off <br /> Float Chem-Talner Unknown tank Floor <br /> Automatic Shut-off Float WEN Steel Diesel Buggies Concrete Floor <br /> Drain building <br /> Diesel Water Gravity Unknown Steel Diesel Buggies Concrete Floor <br /> Separator Drain building <br /> Fuel Pump Pumps Pnuematic Pump WEN Steel Diesel Buggies Concrete floor <br /> Drain building <br /> Double Diaphragm Pnuematic Pump Unknown Unknown Drain Building Concrete floor <br /> Pumps <br /> Sump Tank"Bread Gravity Unknown Steel Drain Building Concrete floor <br /> Box" <br /> ANCILLARY'EDOIPMENTI. QfiAS5OCiATEb WITH THE HAZARDOUS WASTETANK 5VSTEM <br /> Emergency Vents Pressure Mends- Steel Gas 1/Gas2 Concrete secondary <br /> containment pad <br /> PressureNaccum pressureNacuum New Husky Steel Gas 1/Gas2 Concrete secondary <br /> Vents containment pad <br /> Level Gauge Float Scully Unkgauge SteeUPolypropylene Gasl/Gas2 Concrete secondary <br /> containment pad <br /> Emergency Vents Pressure Unknown Steel Fresh Diesel Tank Concrete <br /> PressureNaccum PressureNaccum Unknown Steel Fresh Diesel Tank Concrete <br /> Vents <br /> Level Gauge Float Scully Uni-gauge SteeliPolypropylene Fresh Diesel Tank Concrete <br /> Updated by RS 7/18/18 <br /> Reviewed by MMC 7/27/18 <br />