My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PARALLEL
>
319
>
2900 - Site Mitigation Program
>
PR0545647
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:31:10 PM
Creation date
5/18/2020 3:15:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545647
PE
2950
FACILITY_ID
FA0007344
FACILITY_NAME
REECE, DAVID
STREET_NUMBER
319
STREET_NAME
PARALLEL
STREET_TYPE
AVE
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
319 PARALLEL AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WaterWork <br /> Health and Safety Plan <br /> Underground Tank Investigation <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> The Health and Safety Plan, for underground tank investigations, <br /> provides for the protection of on-site personnel and the <br /> surrounding community during site characterization activities. <br /> The requirements, specifications and procedures presented with <br /> this plan will apply to all personnel on-site, including <br /> employees, sub-contractors, site visitors and regulatory agency <br /> personnel. <br /> KEY PERSONNEL <br /> WaterWork ' s Safety Coordinator/Project Manager will provide <br /> training to site personnel in the use of safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> program. The Safety Coordinator/Project Manager will have the <br /> authority to deny access to any individual without the proper <br /> training or protective equipment required for the site conditions <br /> or those individuals disregarding site safety procedures. All <br /> site personnel will be under the direction of the Safety <br /> Coordinator/Project Manager. <br /> HAZARD ANALYSIS <br /> The property previously operated a gasoline and/or diesel fuel <br /> distribution facility. Historic data and evaluation of <br /> subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel contamination. <br /> The activities addressed by this safety plan include surface and <br /> subsurface soil and groundwater sample collection. These <br /> activities present the potential for exposure to toxic materials <br /> through both skin contact and inhalation. The subsurface <br /> sampling may also pose a fire and explosion hazard from gases and <br /> vapors trapped beneath the ground surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.