Laserfiche WebLink
REVISED MONITORING AND REPORTING PROGRAM ORDER NO.R5-2008-0148 -4- <br /> LAWRENCE LIVERMORE NATIONAL SECURITY,LLC AND <br /> THE U.S. DEPARTMENT OF ENERGY FOR <br /> LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300 <br /> SAN JOAQUIN AND ALAMEDA COUNTIES <br /> Table 2 continued. Sewage ponds groundwater analytes, analytical methods and <br /> re ortin limits <br /> EPA (E) or Reporting <br /> Anal to Standard Method SM Limit2 Units <br /> 7Arsenic E200.8 0.002 m /L <br /> Barium E200.7 or E200.8 0.025 m /L <br /> Boron E200.7 0.05 m /L <br /> Cadmium E200.8 or 3113B 0.05 m /L <br /> Calcium E200.7 0.5 m /L <br /> Chromium E200.8 or 3113B 0.001 m /L <br /> Chromium NO E218.6, 7199 or E200.8 0.001 m /L <br /> Copper E220.2 or E200.8 0.001 m /L <br /> Iron E200.7 0.1 mg//L <br /> Lead E239.2 or E200.8 0.005 m /L <br /> Magnesium E200.7 0.5 mg/ L <br /> Manganese E200.7 or E200.8 0.03 m /L <br /> Mercwy SM3112B or E245.2 0.0002 m /L <br /> Molybdenum E200.7 or E200.8 0.025 m /L <br /> Nickel E249.2 or E200.8 0.002 m /L <br /> Potassium E200.7 1 m /L <br /> Selenium E270.2 or E270.3 or E200.8 0.002 m /L <br /> Silver SM3113B, E200.8, or E200.7 0.01 m /L <br /> Sodium E200.7 11 m /L <br /> Vanadium E200.7 or E200.8 0.02 m /L <br /> Zinc E200.7 or E200.8 0.02 m /L <br /> Or equivalent method as approved by the Central Valley Water Board. <br /> 2 All detections between the reporting limit and detection limit shall be reported as estimated with a"J" flag. <br /> PERCOLATION PIT INSPECTIONS <br /> 8. The Discharger shall inspect monthly the five mechanical equipment percolation pits <br /> located at Buildings 806A, 827 A, C, D, and E to verify that they are operating <br /> properly. If standing water is visible during the quarterly inspection, the Discharger <br /> shall increase the inspection frequency to weekly until no standing water is visible. <br /> 9. The Discharger shall inspect monthly the seven cooling tower percolation pits <br /> located at Buildings 801, 809, 812, 817A, 826, 827A, and 851. If standing water is <br /> visible during the quarterly inspection the Discharger shall increase the inspection <br /> frequency to weekly until no standing water is visible. The more frequent inspections <br /> are required at percolation pits with standing water in order to prevent overflow of the <br /> percolation pits. <br />