Laserfiche WebLink
1 <br /> Table 1 <br /> General Clearances Required from Energized Overhead High-Voltage Conductors <br /> NOMINAL VOLTAGE Minimum Required <br /> PHASE TO PHASE Clearance Feet <br /> 600 to 50,000 6 <br /> Over 50,000 to 345,000 10 <br /> Over 345,000 to 750,000 16 <br /> Over 750,000 to 1,000,000 20 <br /> 4. Boom-type lifting or hoisting equipment. The erection, operation or <br /> dismantling of any boom-type lifting of hoisting equipment, or any part <br /> thereof, closer than the minimum clearances from energized overhead high- <br /> voltage lines set forth in Table 2 shall be prohibited. <br /> 5. Storage. The storage of tools, machinery, equipment, supplies, materials, or <br /> apparatus under, by, or near, energized overhead high-voltage lines is hereby <br /> expressly prohibited if at any time during such handling or other manipulation <br /> it is possible to bring such tools, machinery, equipment, supplies, materials, or <br /> apparatus, or any part thereof, closer than the minimum clearances from such <br /> lines as set forth in Table 1. <br /> (c) The specified clearance shall not be reduced by movement due to any strains <br /> impressed (by attachments or otherwise) upon the structures supporting the <br /> overhead high-voltage line or upon any equipment, fixtures, or attachments <br /> thereon. <br /> (d) Any overhead conductor shall be considered to be energized unless and until <br /> the person owning or operating such line verifies that the line is not energized, <br /> and the line is visibly grounded at the work site." <br /> Table 2 <br /> Boom-Type Lifting or Hoisting Equipment Clearances Required From Energized Overhead High- <br /> Voltage Lines <br /> NOMINAL VOLTAGE Minimum Required <br /> PHASE TO PHASE) Clearance Feet <br /> 600 to 50,000 10 <br /> Over 50,000 to 75,000 11 <br /> Over 75,000 to 125,000 13 <br /> Over 125,000 to 175,000 15 <br /> Over 175,000 to 250,000 17 <br /> Over 250,000 to 370,000 21 <br /> Over 3 70,000 to 550,000 27 <br /> Over 550,000 to 1,000,000 42 <br /> Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code. <br /> Project No.S8475-06-70 -10- April 25,2003 <br />