My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 9:06:46 AM
Creation date
5/19/2020 8:52:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
between upper and possible lower aquifers, the casing will be sealed <br /> with a bentonite plug from two feet (2' ) below the impervious strata <br /> to two feet (2' ) above that strata. San Joaquin County monitoring <br /> well standards will be followed. <br /> TASK II <br /> 1. Twelve ( 12) soil borings will be made around the evaporation ponds <br /> as shown on Exhibit 2, page 9. Drilling will be to groundwater <br /> plus two feet (2'±). Samples will be taken at two feet (2'±) <br /> and six feet (6'±) above the water table and also at approximately <br /> one foot(1' ) below the water table. Field evaluation of the <br /> electrical conductivity of the water in each bore hole will be <br /> performed. Soil samples will be taken from the continuous cores <br /> and analyzed for chlorides. <br /> All bore holes will be sealed in the presence of San Joaquin Local <br /> Health District staff using a bentonite/cement slurry. <br /> 2. Elevations will be established at the top of each boring so that <br /> the elevation relative to sea level can be applied to the strata <br /> identified by the continuous core samples. <br /> 3. After the wells are developed, they will be sampled and measured <br /> for electrical conductivity and elevation of the groundwater (twice <br /> monthly during July, August, September, and October). <br /> 4. All data will be compiled on a monthly basis and shown graphically <br /> and in tabular form. <br /> 5. A report compiling all of the accumulated data to that time will <br /> be prepared by October 15, 1988. <br /> 6. A Water Quality Impact Report will be prepared by November 1, <br /> 1988. The report will cover the impacts on the aquifer at the <br /> Southwest Hide Company property and local vicinity including local <br /> groundwater management options for water quality modification <br /> to meet state and local criteria. <br /> 7. Subchapter 15 informational requirements will be completed by <br /> November, 1988. <br /> Depending on the tentative waste discharge requirements, it may be <br /> necessary to provide additional work under a Task III work description. <br /> Exhibit 3, page 10 following provides a graphic exhibit showing the <br /> time schedule for the proposed work. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.