Laserfiche WebLink
CHRONOLOGY <br /> SAN JOAQUIN SULFUR COMPANY <br /> 711 N SACRAMENTO ST <br /> LODI CA <br /> TANK #1 500 GALLON GASOLINE REMOVED05-22-87 <br /> 05-2-87 One 500 gallon gasoline tank removed this date. One <br /> soil sample was obtained from approximately 12' bgs. The <br /> PHS-EHD inspector at the site noted odors. The results of the <br /> soil sample showed 2800 ppm TPH gasoline, <20 ppm <br /> benzene, 160pP m toluene, and 610 ppm xylene: Total lead <br /> was not detected at a detection limit of 5.0 ppm. <br /> 03-26-96 Site placed into the LOP this date. <br /> 05-02-96 PHS-EHD receives wp to investigate the extent of the <br /> release. <br /> 06-24-96 PHS-EHD receives the report of the fieldwork.that <br /> occurred on 05-28-96. One soil boring was installed to 50' bgs. <br /> Contamination was evidenced in the upper soils and a MW was <br /> installed in this boring to confirm groundwater not at risk. <br /> Results of soil sampling confirm groundwater not at risk, <br /> therefore beneficial uses not at risk. Table of results attached. <br />