Laserfiche WebLink
4.1.2 Hazards Associated with Work Activities <br /> The site investigation consists of work tasks that will be <br /> conducted onsite. This section of the Health and Safety Plan <br /> briefly describes each work task and the potential chemical and <br /> physical hazards posed to workers by each task. Sections 1.2 <br /> through 1.11 of this Plan describe the standards and procedures <br /> that will be implemented to mitigate these hazards. <br /> 1. Monitoring well installation. One groundwater <br /> monitoring well will be installed using a hollow stem <br /> auger. The purpose of the well will be to establish <br /> the level, if any, of contamination in the groundwater. <br /> Hazards: Worker exposure to the identified chemicals <br /> could occur due to inhalation of these compounds, <br /> inhalation of contaminated dust, or skin contact with <br /> contaminated soil or water. <br /> Drilling rigs may create hazards due to falling <br /> objects, swinging objects and/or lines; rigs will <br /> travel or back near workers performing related work <br /> task; and noise exposures may be generated by hammering <br /> activities, and from equipment engines. <br /> 2. Soil and groundwater sampling. soil samples will be <br /> collected from borings, and groundwater samples from <br /> developed wells. <br /> Hazards: Worker exposure to the identified chemicals <br /> could occur due to inhalation of these compounds, <br /> inhalation of contaminated dust, or skin contact with <br /> contaminated soil or water. <br /> 4.2 ASSIGNMENT OF RESPONSIBILITIES <br /> 4-4 <br />