Laserfiche WebLink
... <br /> poison control centers) , and arranging for emergency <br /> transportation to medical facilities <br /> Examining work party members for symptoms of expcsure <br /> or stress Ensuring that each team member has been <br /> given the proper medical clearance by a qualified <br /> medical consultant; monitor all team members to <br /> determine compliance with the applicable physical <br /> requirements as stipulated in the H&S plan. <br /> 4.2.4 Technicians/Subcontractors <br /> l chnicians, subcontractors, and other personnel on site will be <br /> responsible for understanding and complying with all site <br /> requirements. H&S requirements will be included in subcontracts. <br /> on site or preproject training will be conducted, and topics <br /> cited in Section 1..4.2 will be discussed. All participants will <br /> sign a written statement indicating they are aware of the site <br /> hazards and protective requirements. <br /> 4.3 MEDICAL SURVEILLANCE <br /> 4.3.1 Physical Examination <br /> r <br /> As required by IT Policies and Procedures 9410.10 and 9410.2B, <br /> all IT personnel on site will have successfully completed a <br /> preplacement or periodic physical examination as appropriate. <br /> This examination has been designed to comply with OSHA <br /> requirements in 29 CFR 1910.120 for hazardous waste site <br /> operations. <br /> The IT medical surveillance program examination consists of: <br /> Medical and occupational history form (detailed <br /> questionnaire for new employees, short questionnaire <br /> for periodic exams) <br /> 4-7 <br />