Laserfiche WebLink
13.0 Summary and Checklist <br /> 13.1 Summary <br /> The Pacific Bell project involves drilling, installation, and sampling of four monitoring wells. <br /> The work will be conducted in Level D personal protective equipment unless air monitoring <br /> results require upgrading to Level C protection. Medical and emergency assistance is readily <br /> available from resources nearby. <br /> 13.2 Checklist <br /> ❑ First aid kits (one per vehicle and facility) <br /> I` ❑ Fire extinguishers (one per vehicle and facility) <br /> ❑ Safety glasses or goggles, ANSI approved <br /> ❑ Hard hats, ANSI approved <br /> ❑ Ear plugs <br /> ❑ Impermeable gloves <br /> ❑ Work gloves <br /> ❑ Steel toed work boots, ANSI approved <br /> ❑ Tyvek suits <br /> ❑ Air monitoring equipment <br /> ❑ Duct tape <br /> ❑ Trash bags <br /> ❑ Eyewash <br /> ❑ Portable toilet <br /> ❑ Drinking water and disposable cups <br /> ❑ Air Plying respirators <br /> ❑ Organic vapor/HEPA cartridges, NIOSH approved <br /> ❑ Complete Health and Safety Plan <br /> ❑ All applicable MSDSs (see HASP appendix) <br /> ❑ Jobsite Posting Board <br /> MZI05409-94NST/'94-0064 13-1 <br />