Laserfiche WebLink
at a concentration of 12 ppm at a depth of 30 feet bgs Fabricare went into bankruptcy and failed <br /> to pay AEMC, who in turn refused to release the complete report documenting well installation <br />' and soil sampling results Mr Harlin Knoll of the PHS/EHD was able to obtain a copy of the <br /> analytical laboratory reports from the property owner's legal counsel <br />' 1.3 Project Objectives <br /> The objectives of the project are the following <br /> I Document, to chronological order, all previous environmental corrective action <br /> activities <br /> 2 Determine the possible presence of gasoline hydrocarbons in the groundwater <br />' beneath the site in the vicinity of former Tank A <br /> 2.0 Scope of Work <br /> To achieve these objectives. a scope of work consisting of the following five tasks was <br />' performed. <br /> 1 Preliminary Site Inspection <br /> 2 Preparation of a Health and Safety Plan <br /> 3 Groundwater Monitonng <br /> 4 Groundwater Sampling and Analyses <br /> 5 Environmental Records File Review <br /> 2.1 Preliminary Site Inspection <br /> On April 26, 1996, IT performed a preliminary site inspection with Mr Harlin Knoll of the <br />' PHS/EHD to determine the condition and accessibility of the three on-site monitoring wells The <br /> wells appeared to be fully functional and easily accessible <br /> 2.2 Health and Safety Plan <br /> Prior to initiating field work, a site-specific health and safety plan was prepared in accordance <br /> with 29 CFR 1910 120 The health and safety plan included safety procedures for work to be <br /> performed, chemical hazard information, site safety officers, and preferred medical emergency <br /> location An abbreviated version of the health and safety plan without its attachments is included <br /> in.Appendix A _ <br /> 4 <br />