1 <br /> i <br /> pack. The remaining annular space will be grouted to the surface and a <br /> flush-mounted traffic box with a locking lid will be set directly into the <br /> wet grout. Well construction logs will be filled out for each <br /> monitoring well. Well construction specifications are described below. <br /> • The slotted PVC will be four-inch diameter, schedule 40. Length of <br /> the slotted PVC will be determined at each location. The PVC will <br /> be capped on the bottom with a threaded cap and will be flush- <br /> threaded to the casing above. <br /> • The slot size will be either 0.010 or 0.020 inches, depending on the <br /> formations encountered during the soil sampling activities. <br /> • The well casing will be four-inch diameter schedule 40 PVC. It will <br /> be flush-threaded to the screen below and a slip cap will be placed <br /> on top. <br /> • The filter pack will probably consist of clean #30 silica sand, which is <br /> compatible with both 0.010 and 0.020 slot size. <br /> • The well seal will be made with bentonite pellets placed <br /> immediately on top of the filter pack. The remainder of the <br /> annular space will be filled with grout using a tremie. <br /> • The grout mix will comply with existing State of California <br /> regulations. <br /> • The well cover will be a flush-mounted traffic box with a locking lid <br /> set directly into the wet grout. Each well casing will be permanently <br /> inscribed or otherwise marked with a unique identification <br /> number. <br /> Surveying <br /> Following well completion, each new well will be surveyed by a <br /> licensed surveyor to determine its horizontal coordinates and <br /> elevation. If a bench mark is not available, the wells will be referenced <br /> to an arbitrary datum. <br /> Monitoring Well Development <br /> Each completed monitoring well will be developed using a low- <br /> volume, submersible pump. In the event that recharge in the wells is <br /> inadequate for the pump, the wells will be developed with a large <br /> capacity (three-gallon) bailer. Before each well is developed, all <br /> submersible equipment will be decontaminated with an Alconox <br /> 4-7 <br />