Laserfiche WebLink
TABLE OF CONTENTS <br /> PAGE <br /> SECTION 4 (CONT.) <br /> Phase II - Monitoring Well Installation 4-5 <br /> Well Bore Installation 4-6 <br /> Drill Cutting Disposition 4-6 <br /> Monitoring Well Construction 4-6 <br /> Surveying 4-7 <br /> Monitoring Well Development 4-7 <br /> Monitoring Well Purging 4-8 <br /> Groundwater Elevation Measurement 4-8 <br /> Monitoring Well Sample Collection 4-9 <br /> Monitoring Well Sample Analysis 4-9 <br /> Decontamination Procedures 4-10 <br /> Purge Water Containment and Disposal 4-10 <br /> Sample Shipment and Chain-of-Custody 4-11 <br /> SECTION 5 <br /> QUALITY ASSURANCE/QUALITY CONTROL 5-1 <br /> Project Planning QA/QC Responsibilities 5-1 <br /> Principal-in-Charge 5-1 <br /> Project Manager 5-1 <br /> Quality Assurance Officer 5-2 <br /> Field QA/QC Responsibilities 5-2 <br /> Site Investigation Leader 5-2 <br /> Safety Coordinator 5-3 <br /> Site Health and Safety Officer 5-3 <br /> Laboratory QA/QC Procedures 5-3 <br /> Method Blank Analysis 5-4 <br /> Surrogate Spikes 5-4 <br /> Matrix Spikes and Duplicates/Spike Duplicates 5-4 <br /> ii <br />