My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0009011
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:01:33 PM
Creation date
5/19/2020 1:47:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009011
PE
2954
FACILITY_ID
FA0004080
FACILITY_NAME
NAVCOMSTA
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
952035000
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CAUF,-.)RNIA PETE WILSON,Governor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road,Suite A <br /> Sacramento, CA 95827-3098 <br /> PHONE: (916) 361-5600 <br /> FAX: (916) 361-5686 <br /> ;a 19 August 1992 <br /> Ms. Mary Obl and �� <br /> Engineer-in-Charge <br /> Department of the Navy Western Di vi s i orae}�tRi�1i ��� `� <br /> Naval Facilities Engineering Commando /` � <br /> 900 Commodore Drive <br /> San Bruno, CA 94066-2402 <br /> SAMPLING AND ANALYSES PLAN, NAVAL COMMUNICATION (NavCom) STATION, STOCKTON, <br /> SAN JOAQUIN COUNTY <br /> Enclosed are our comments on your Sampling and Analyses Plan prepared by Pith <br /> Environmental Management, Inc. dated 22 May 1992, and received 26 June 1992. <br /> The format of the sampling plan is well organized and the Field Sampling <br /> Summary sheets were particularly helpful in review. Most of the tasks proposed <br /> in this plan are acceptable with the inclusion of a few modifications outlined <br /> in this letter and detailed in the attached memo. <br /> This plan shows NavComs' intentions to verify contaminant source areas as <br /> opposed to assessing the hydraulic relationships, and pathways for contaminant <br /> movement as proposed in August 1990 prepared by The Mark Group. The <br /> recommendation to confirm contaminant problems on the NavCom site is an <br /> acceptable concept, however in order to complete the Remedial Investigation <br /> under the CERCLA process, characterization of the regional and site <br /> hydrogeology and evaluation of contaminant fate and transport will be <br /> required. <br /> PRC has proposed to sample all existing wells in addition to drilling and <br /> sampling 23 shallow and 10 intermediate depth monitoring wells to confirm the <br /> sources of contamination identified in previous investigations. The locations <br /> of the additional wells are adequate for a preliminary assessment. We also <br /> agree with the Navy's arrangements to proceed immediately with the geophysical <br /> survey to locate boundaries of landfill areas and suspected buried channels. <br /> Subsequent to evaluation of this data, we would like to see the locations for <br /> cone penetrometer test (CPT) sites selected by your consul 'Lafii,s. This <br /> information may be submitted in a letter addendum along with additional work <br /> requested below. <br /> Unfortunately, there was no mention of any proposed cleanup actions in this <br /> plan. Additional work must be carried out to evaluate surface water discharges <br /> into Burns Cutoff and remove polluted soils within the drainage ditches (see <br /> Memo comment 3, Administrative Area) . Soils, surface water and ground water <br /> samples in the drainage ditches must also be analyzed as part of this site <br /> investigation. <br /> Minor changes in the Sampling and Analyses Plan should include: (1) deletion <br /> of the monitoring wells proposed to be located adjacent to the Shell and BP <br /> Bulk Storage facilities, as we are currently overseeing investigation of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.