9. Mr. Pinasco was also concerned that the RI/FS was moving to slowly. <br /> 10. Mr. Seraydarian asked if all documents pertaining to the RI/FS vaere <br /> required to be completed. Mr. Reents is aware of the Navy's budget <br /> constraints , but RWQCB would still require documentation specifying timeframes <br /> for completion. He did indicate that if interim actions were taken that <br /> showed contamination was not migrating off the facility , it could be a basis <br /> for extending the time to complete the RI/FS. <br /> 11 . LCDR Moreau sugge:;ted that the TEC meet again after each agency has <br /> reviewed the scoping document. Specific elements of the workplan should also <br /> be addressed at the next TRC. An exact date will be determined once the <br /> scoping doucument has been issued for review. <br />