My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0009011
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 1:53:35 PM
Creation date
5/19/2020 1:49:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009011
PE
2954
FACILITY_ID
FA0004080
FACILITY_NAME
NAVCOMSTA
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
952035000
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• To maintain the shipping channel at a depth sufficient to allow full economic use of <br /> the Project Area. <br /> • To revitalize and redevelop the Project Area, eliminate blight, and develop specific <br /> land uses,which are anticipated to be associated with industrial, commercial, and <br /> maritime activities on site. <br /> • To allow for the development of a land use map or diagram that includes a mixture of <br /> commercial and industrial uses at a program level of detail. <br /> • To develop an environmental document that will be used as the basis of further <br /> CEQA analysis for many forthcoming projects related to the development of this <br /> area. <br /> • To facilitate the design and construction of on-site physical improvements and update <br /> existing physical improvements needed to serve to the project site. <br /> • To identify any necessary new infrastructure and improvements to existing <br /> infrastructure necessary to support the intended land uses. <br /> Potential Impacts <br /> The Port has reviewed the Proposed Project and has determined that the EIR should <br /> address the following issues: <br /> ■ Land Use Consistency and Compatibility <br /> ■ Transportation/Circulation <br /> ■ Hydrology/Flooding/Water Quality <br /> ■ Air Quality <br /> ■ Noise <br /> ■ Biological Resources <br /> ■ Public Facilities and Services <br /> ■ Cultural Resources <br /> ■ Hazardous Materials and Human Health <br /> ■ Aesthetics <br /> ■ Population and Housing <br />
The URL can be used to link to this page
Your browser does not support the video tag.