Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection Z 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181355 3/2/20 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> TIWANA GAS <br /> Business Site Address City ZIP Code <br /> 1210 E HAMMER LANE STOCKT ) N 95210 <br /> Il . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification) Phone # <br /> Edward Stearns (209 ) 744 - 0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 14- 1760 Ex . 09/30/2020 8883080-UT 11 /9/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications) <br /> FF- EBW , PhikTite & EVR Phase 1 1009893708 Ex 11 /29/2020 OPW 104-635 Ex 3- 14-2020 <br /> Emco 3205 Ex . 11 / 16/2020 ATG : VR A31048 Ex . 8/9/ 19 Incon 1009893708 11 /30/2020 <br /> III . OVERFILL PREVENTION EQUIPMENT II PECTI'QN IN OR NATMI in <br /> Inspection Method p Manufacturer Guidelines (Specify): REMOVE AND INSPECT . . <br /> Used : <br /> ❑ industry Code orEngineering Standard (Specify) : PR <br /> ❑ Engineered Method (Specify) : <br /> r „ # of Attdctied rages <br /> Attach the inspection procedures and all documentation required to determine the results i F 2 <br /> TANK ID : (By tank number, stored product, etc.) 87 89 91 <br /> What is the tank inside diameter? (Inches) 127 , 50 127 . 50 127 . 50 <br /> Is the fill piping secondarily contained ? ❑x Yes ❑ No El Yes ❑ No N Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained ? ❑ Yes EINo ❑ Yes 9 No ❑ Yes ❑x No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) FRANKLIN FUELNG FRANKLIN FUELING FRANKLIN FUELING <br /> DEFENDER DEFENDER DEFENDER <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow ❑x Shuts Off Flow M Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) E] Restricts Flow ElRestricts Flow ❑ Restricts Flow ElRestricts Flow <br /> ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm ❑ AIV Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes E No ❑ Yes 0 No ❑ Yes 0 No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set 108 . 5 109 . 5 109 . 5 <br /> to activate . (Inches from bottom of tank.) <br /> What is the percent capacity of the tank at which the <br /> i overfill prevention equipment activates? SIM 91 . 3 91 . 3 <br /> i <br /> i Is the overfill prevention in proper operating condition ❑x Yes 9 Yes Z Yes ❑ Yes <br /> to respond when the substance reaches the <br /> i <br /> appropriate level ? ElNo (Specify in V.) ElNo (Specify in V) ElNo (Specify in V) ElNo (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results Pass ❑ Fail ZPass E] Fail Pass ❑ Fail ❑ Pass El Fail <br /> V. COMMENTS <br /> Any items marked "Fail' must be explained in this section. Any additional comments may also be provided here. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23, <br /> Division 3 , Chapter 16, Section 2637. 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> E` If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> j' CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Coundl, AN = Audible and Usual <br /> C <br />