My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:52:58 AM
Creation date
5/19/2020 2:19:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps;9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> Ste Address &WAt Gas-1210 E Hammer Lane Stockton CA 95213 <br /> - . . . . . ae 97. . . . . . . . . . . . . . North <br /> . . . . . . . . . . . . . . . . . . . <br /> OA : : O O <br /> *PIPE\G+ <br /> (ARROWS) <br /> X F X F X F Bn^•iaE ofpipmg <br /> exit of soap and <br /> UDC's.\o <br /> underground <br /> dranna is <br /> accurate,%%e <br /> OP O O c3ncot speculate <br /> Eke prints. <br /> L L <br /> � . . . . . <br /> . . . . . . . <br /> 3- L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> Canister <br /> C-STORE : : : : <br /> VR TLS 350 <br /> Imo. <br /> . . . . A=,tvtvu ARSetoaor <br /> . F=FILLS <br /> V_`AMR <br /> P-PROBE <br /> L=Turbine`Leak Detector <br /> 5= X=SIA 1P SENSOR <br /> B=Brine Sensor <br /> C C S=Smart Senator_ C=Floats At Cbaim <br /> .— -- L . . . . . . . E=E Stop <br /> iti f:Em ruaaara ourzd thx ora not viable to the cart(f ung tsrlotfcian ma a <br /> prcre.:,ionai opinion ons:old tire:oleh�for irtformxional p:rrpa:et. Drmring <br /> not to scala <br /> Instructions <br /> i <br /> if you alreacy have a diagram that shows at;required Information you may include't,rather than this page,with your(,Monitoring System Certification On your s.te plan. <br /> shcvj the general layout of tanks and piing. Clearly identify locators of the following equipment,if installed,monHering system ccntol Farels;sensors monitorng tank <br /> annular spaces,surrps.dispenser pans,spill containers,or other secor nary containment areas.mechar ral or electronic line leak detectors;and in-tank Ilquid level <br /> probes lif used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.