Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII . LINE LEAK DETECTOR TESTING Y N NA <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) <br /> This section must be completed if LLDs are installed. ❑ ❑ ❑ <br /> Was a leak simulated to verify LLD performance? GPH. 1 0 .2 GPH <br /> Check all that apply. ) Simulated leak rate verified : [] 3 GPH ❑ 0 ❑ ❑ El El <br /> Was the testing apparatus properly calibrated? ■ <br /> M Li <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected? <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ ❑❑ <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? O ❑❑ ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? ❑ ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> For an answer of "Al" above, descrihe in section Xlll XIII and COMMENTSes were or will be corrected. <br /> Replaced T-4 Diesel Line Lek Detector, originally failed 3gph testing . Retested new LD and passed . <br /> WINE liiiiiii NEW WE= <br /> XIV . VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> [] Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> pp F1Pressure El Hydrostatic System Type (Mark all that ay )I ❑ Vacuum Sensor Functionality Interstitial Communication <br /> Test Test <br /> Sensor ID Component(s) Monitored by this Sensor <br /> ❑ Pass El Fail F1 Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Simulated leak at far ends of the interstitial space . ❑ Visual Inspection <br /> How was interstitial communication verified? ❑ Gauge <br /> El Other (Describe the method in section XV below.) <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? El Yes [I No (Describe the reason in section XV below.) <br /> For an answer of "FAIL " above, describe in section XV w n " when these sues were or will be corrected. <br /> OMMENTS <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification <br />