Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1 ) <br /> Type of Action Installation Test Repair Test F 12 Month Test <br /> 1. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test: <br /> 10166191 2/6/2020 <br /> Business Name (Same as Facility Name or DBA-Doing Business As . ) <br /> 7 ELEVEN 35355 <br /> Business Site Address City: Zip ' <br /> 3202 W HAMMER LANE (NA 36) STOCKTON 95209 <br /> If. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test ( Print as shown on the ICC Certification . ) Phone # <br /> Jesus Saldivar (800) 8004633 <br /> Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> Class A General Engineering 743160 8361393 6/13/2021 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> ICC - CA UST Service Technician 8361393 06/13/2021 Tanknology Certification - Level III Spill Container Testing Certification Exam 115240 <br /> 06/09/2022 <br /> 111. SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used : Manufacturer Guidelines : (Specify) <br /> Industry Code or Engineering Standard : (Specify) PEI RP 1200 <br /> Engineered Method : (Specify) <br /> Attach the testing procedures and all documentation required to determine the results . # of Attached Pages <br /> Tank ID : (By tan , stored product, etc.) Fill T1 : Fill T2 : Fill T3 : <br /> k number, <br /> i RUL PUL Diesel <br /> F <br /> Spill Container Manufacturer: OPW OPW OPW <br /> Non-Metallic r Non-Metallic Non-Metallic Non-Metallic <br /> Method of Cathodic Protection r Isolation r Isolation r Isolation Isolation <br /> r Other r Other Other Other <br /> Specify in section V) (Specify in section V) (Specify in section V) (Specify in section V) <br /> Inside Diameter of Spill Container: ( Inches) 12 12 12 <br /> Depth of Spill Container: ( Inches) 15 15 15 <br /> Does the spill container have a 5 gallon capacity? W Yes r No r Yes r No P Yes r No r Yes r No <br /> r <br /> Drain Valve F Drain Valve Drain Valve r Drain Valve <br /> Method to Keep Spill Container Empty r Onsite Pump r Onsite Pump r Onsite Pump r Onsite Pump <br /> r Other r Other r Other r Other <br /> (Specify in section V) (Specify in section V) (Specify in section V) (Specify in section V) <br /> N. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results W.Pass r Fail WPass F Fail tt!! Pass r Fail I Pass Fail <br /> V. COMMENTS <br /> All items marked failed above must be explained in this section . Any additional comments may also be provided here . <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3 , chapter 16, section <br /> 2637 .1 and all the information contained herein is accurate . <br /> UST Service Technician Signature <br /> J�/ <br /> If the facility has more components than this form accommodates , additional copies of this page may be attached . <br />