My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:06:07 AM
Creation date
5/19/2020 3:15:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page s of s) <br /> XVII. FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer I Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ I C 1 D <br /> A 0 1 so I C Li I D <br /> Test Method Used; D Manufacturer Guidelines (Specify): <br /> Q Industry Code or Engineering Standard (Specify): <br /> Q Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Fill Riser Sump Testing Training and Certifications (List applicable certifications) Expiration Date <br /> XVIII, COMMENTS <br /> Provide any additional comments here. <br /> E <br /> XIX . VENT 1 TRANSITION SUMP TESTING INFORMATION <br /> Manufacturer Identi Vent 1 Transition Sump ID from Section iii for each Manufacturer <br /> a LJ b 0 C 1 d ❑ <br /> a ❑ I b ❑ C d <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) <br /> [I Industry Code or Engineering Standard (Specify): <br /> ❑ Engineered Method (Specify) : <br /> # orAttached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> I' Vent f Transition Sump Testing Training and Certifications (List applicable certifications ) Expiration Date <br /> i <br /> i <br /> i <br /> it <br /> XX, COMMENTS <br /> Provide any additional comments here. <br /> 10 = Iderffaition <br />
The URL can be used to link to this page
Your browser does not support the video tag.