My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:06:07 AM
Creation date
5/19/2020 3:15:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�RECE ' VED <br /> Kill I 61 820 <br /> --,» I N TANK ALARM -- — —...-- IN-TANK ALAP14 - - <br /> T 3 : 0IESEL T 3 :DIESEL <br /> PRESSURE LINE LEAK ALARM LOW TEMP WARNING MAX PRODUCT ALARM <br /> 0 1 : 97 JUN 18 . 2020 9946 AM JUN 18. ?020 9 : 50 AM <br /> PLLD SHUTDOWN ALARM <br /> JUN 18. 2020 9 : 09 AM <br /> IN-TANK ALARM - _»__ _�. . INTAIIK ALARM � -_ - - <br /> T 99DIESEL T 2 :PREMIUM <br /> PRESSURE LINE LEAK ALARM HIGH PRODUCT ALARM OVERFILL ALARM <br /> 0 2 : 91 JUN I8 . 2020 9 : 47 AM JUN I8 . 2020 9951 AM <br /> PLLD SHUTDOWN ALARM <br /> JUN 19 . 2020 9 : 09 AM <br /> INTANK ALARM ---» » --- AUTODIAL ALARM - - - <br /> PRESSURE LINE LEAP. ALARM 8 EERFILLLLALARM AUTODIAL FAILURE <br /> Q 3 : 1DIRSEL JUN [ Be 2020 9 : 47 AM JUN 16 . 2020 9951 AM <br /> PIOLDSNTDONALARM 09 99AM <br /> -- IN TANK ALARM - - --- ---- IN-TANK ALARM - - - <br /> T- 1 : UNLEADED T 2 : PPXMIUM <br /> SENSOR ALARM —»--- HIGH PRODUCT ALARM HIGH PRODUCT ALARM <br /> L12 : DIESEL ANNULAR JUN 18 • '2020 9 : 49 AM JUN 18 . 2020 9 : 51 AM <br /> ANNULAR SPACE <br /> FUEL ALARM <br /> JUN 18 . 2020 9 : 09 AM <br /> » » IN TANK ALARM IN TANK ALARM - » -- ^ <br /> T- t9UNLEADED T 2 :PREMIUM <br /> j OVERFILL ALARM MAX PRODUCT ALARM <br /> — --- AUTODIAL ALARM - - -- <br /> D I : JMM JUN 1B . 2020 9949 AM JUN 18. 2030 9 : 52 AM <br />� <br /> AUTODIAL FAILURE <br /> JUN 18 . 2020 9 : 16 AM <br /> i <br /> - -- INTANIf ALARM IN—TANI! ALARM - - - - - <br /> T I : UNLEADED T 1 : UNLEADED <br /> MAX-- IN TAlD; ALARM ---- - JUN 1PRODUCT <br /> 2020 99*449 AM JUN ISO WATER HIGH 2091954 AM <br /> T 39DIESEL <br /> INVALID FUEL LEVEL <br /> JUN 18. 2020 9 : 46 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.