My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 4:44:13 PM
Creation date
5/19/2020 3:40:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 0 <br /> 71SO Overfill Valve in Tank Shut off Level Worksheet <br /> [:] 61 SO Overfill Valve In Tank Shut off Level Worksheet <br /> M2gM# It This is meantto be supplemental worksheet and not a substitute to fallowing the installation <br /> m <br /> janual instructions. All length measurements are In inches. Please contact the Authority Having Jurisdic• <br /> •tion (AW) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity In your region, as well as take Into account other considerations such as extreme tank lift . <br /> Take the following measurements with the valve in - i <br /> stalled in the tank: w i `=S - <br /> Distance from the 7159 Inlet tube flange to the cast Y ` <br /> lug In the 71 SO body (see figures), uppef tube length . <br /> Note; the Upper Tube Length must be at least IV to in- f <br /> dude the protective bend In the tube, !! <br /> (D ) ( li <br /> DistarKe from the 71 SO Inlet tube Marne to the top and <br /> bottom of lower tube, valve length . <br /> ( W) = � ( �1 Upper <br /> (U ) tube <br /> Distance from the 7150 Inlet tube flange to lite bottorn <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0.61 I Wri Valve <br /> Length. <br /> t:OttORi of <br /> From the tank calibration chart provided by tank manu - cut <br /> fatturer find the dipstick number M which corresponds I <br /> tothe 1000046volum=. (HI I <br /> ( Y) = - - To Tans. X <br /> t\ <br /> M <br /> 1 . To determine shut-off percentage : Tank <br /> Subtract upper tube length ( o) from distance to tank ! (U) Valve Chart I <br /> t)Gtlorn (fi) . � Length, 1009E <br /> ( - (D) 2 " __ _ _ ` top of cut <br /> X) _ (i3) I Volume <br /> — -- — <br /> L` IpvIr:k <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capadty at the cal - <br /> culated (X) dimension and the 100% volume ( Y) tank <br /> -capacity. <br /> (X) tank capacity in gallons <br /> ( Y) tank capacity in gallon f l ` � WSO — ' - - - <br /> " SO�0 = 1X ) capacity / ( Y ) capacity x100 = _fit' <br /> Note: The overfill valve must be installed per AH ) requtrew <br /> ments and all applicable local, state, and national code}. If <br /> the overfill valve Is set above the allowable shirt off percent <br /> age the overfill valve must be removed and replaced - For <br /> It reference 40 CFR part 280 Subpart 8 Section 280. 20 ovetfi! I <br /> valves sh(0d be set to a maximum of 95% 1 <br /> � roti <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.