My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 4:44:13 PM
Creation date
5/19/2020 3:40:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) Dipstick number(%)=82' top of the Face Seal Adaptor In the spill container to the Tape measure IMPORTANT:Remove all chips and shavings generated <br /> Tank diameter(Y)=92' bottom of the tank(Dint.'B*). In steps 3 thru 5 out of the cut end ofthe tube.DO NOT <br /> (Y)-(X)=(Z) (92'-82'=101 IMPORTANT:Inspect the riser pipe for any foreign ma- / remove chips and shavings by dumping thru valve <br /> (Z)=1(r terial.Over spray from tank relining or any Internal body. <br /> 6) (Z)-2'=C (10'-2"=8') burrs inside ofplpe must be removed priorto lnstalla- Mark Upper Tube <br /> C=8' tion.Failure to have an unobstructed riser pipe may i STEP 4:FILE THE UPPER DROP TUBE <br /> prevent proper installation and operation of the valve. (Cut Line) <br /> 7) Is 8"less than 6-1/2'i File the upper tube square,and remove any buns or <br /> The 71pes.SO designed cannofor t <br /> Instlation liednto Intoschschedule <br /> u seam rough edges.Make sure the cut is flat and square. <br /> riser pipes.The7150 cannot be Installed into schedule Figure2 <br /> NO Measure the distance from the top of the FSA- Writer pipes. IMPORTANT:CarefullyfileagoodchamferontheIn- <br /> 400FaceSealAdaptorinstalledontheriserpipe side edge the drop <br /> to the Inside,top lip of the storage tank and ob- STEP2:MARKTHETUBE STEP 3:CUT UPPER DROP 9 Ptube In provides tep8. the <br /> Attach the supplied band clam to the upper tube Jun <br /> polypak seal and Inlet tube Installed In Step e. <br /> talo measurement(AI. Use the result from Step 1 and HOW TO LOCATE THE PP P PP 1 <br /> POSITION OF THE 71SOAT95%TANK CAPACITY to below the mark and ensure that It is assembled square <br /> Upper tube length=C+(A) mark the upper tube.Measure the distance from the tothetube.Theclamp can be used as a guide for mak- <br /> seam where the upper tube and valve body meet.Use Ing a square cut.If a vise Is used,clamp on the valve <br /> For testable models only,ending In'r:Upper Tube atape measure to mark the calculated upper tube body casting only to avoid damage to the float and <br /> Length-C+(A)-1-1/2" length onto the upper tube See Figure 2. tubes lSee Figure 3A).Carefully saw through the tube <br /> squarely,at the mark made in Step 2.Use hacksaw <br /> ASSEMBLY INSTRUCTIONS Tye mwure with a new fine-tooth blade.Notating the upper tube <br /> as the sawing progresses will minimize run out and en, <br /> sure asquare 90degreecut Remove the band clamp <br /> IMPORTANT:Each of the numbered steps In the Instal- after tube is cut. <br /> lation instructions are designed as a CHECK LIST to en- CAUTION-DO NOT use a pipe or tubing cutter to cut <br /> sure proper installation and trouble free operation of Mymne <br /> the OPW 71 SO Overfill Prevention Valve. the upper drop tube,this may damage the tube, <br /> causing it to be out of round thereby prohibiting <br /> Read and follow these steps carefully,checking them Riser RPe assembly of the unit. <br /> off as you proceed. Sal�Adpiplar IA. Fig— <br /> To T tit (g) <br /> Figure numbers correspond to step numbers for easy ToD B•D.)TO Tank <br /> reference. STEPS:SANDTHE UPPER DROP TUBE <br /> Sand the Inside of the drop tube with sandpaper and/or <br /> STEP 1:MEASURE steel wool to remove all buns and sharp edges.After <br /> Install the OPW Face Seal Adaptor the OPW Thread- sanding wipe down the Inside ofthe tube with a clean <br /> P rag from the top to approximately 4 Inches down to <br /> on Spill Container on the FIII Riser(Refer to the lnstalla- remove any debris. <br /> tion Instructions Supplied with the Spill Container).In- Figure 1 <br /> sert a tape measure through the riser pipe and hook It <br /> under the Inside of the tank in the lengthwise direction. clean the Failuretoproperly chamfer,sand,and <br /> 9t lean the drop tube may cut the seal and result in a <br /> Measure the distance from the top of the Face Seal failure of a pressure decay leak test. <br /> Adaptor the <br /> Inside the base of the spill container <br /> bucket Just below the drain valve outlet window to the LNW�b <br /> Figure3A <br /> Inside,top lip of the gouge unit Dfm.'A�(See Figure 161 A)• <br /> The top flange on the 71 SO will rest on the Face Seal <br /> AdaptorJust below the drain valve outlet,and be <br /> locked In place between the Face Seal Adaptor and the — / mn°cess <br /> 4"nlpple that is Installed In the spill container with the - <br /> J�k <br /> lack Screw Kit(Sea Figure 1A).(For riser pipe configu- . <br /> rations other than that shown,consult Installation M-- hoe xn <br /> drawings or use other necessary means to measure Dl- B'"" <br /> 9 ry YWYasn 8 o-Rmg seal pssengaor <br /> mension'A'). (fy d Fem —Seal <br /> Using a tape measure,measure the distance from the Sale Mapraq 7180 1 ndep°- Figure 5 <br /> cr car <br /> Figure TA 5 Figure 38 6 <br /> STEP 6:APPLY GREASE TO DROP TUBE <br /> 171 SO-TOOL PROCEDURE BELOW, STEP IOA:TIGHTEN THE 71 SO-TOOL <br /> FOR71 SO-TOOLC,SEEPAGE 9 Use the three view holes to ensure that the tool seats <br /> Apply black moly grease to the Inside diameter of the FOR 7150-TOOLCT,SEE PAGE IO out flat against the top ofthe inlet tube.To prevent <br /> upper drop tube.Make sure coverage Is completely vertical movement of the tool during drilling,hand <br /> around the tube as shown in Figure 6. Nae:71 SO-TOOL a an only be used with testable tighten all three knobs evenly to the upper droptube. <br /> / 13 overfillslfmodifiedasshown below.AtI See Figure 10A. <br /> wide slots must <br /> be added to accommodate mat lug. <br /> STEP 11A:PREPARE DRILL AND BIT <br /> _ Add IMile Confirm that the stop on the 3/16'drill bit supplied <br /> slot to use with with the 71 SO-TOOL is in the correct position before <br /> 1testableva,_ drilling.Thestoplsfactorylnstaliedatadistancebe <br /> - <br /> tween 2'tO 2-1/16'from the tip with the 71 SO-TOOL If <br /> n the stop is not at the correct position it must be fixed <br /> Figure .�l before drilling. <br /> �NOTI:T,,able estelet le I-us,haveablettom port in <br /> —� CAUTION:If the drill stop Is not in the proper loca- <br /> line with float.Testable inlet tube bottoms out on tlon(allure o/a pressure decay leak test may result <br /> stop,it does not bottom out on inlet flange.See Fig- /® <br /> re 8A <br /> Figure 6 <br /> STEP 7:APPLY GREASE TO POLYPAK SEAL 71 SO-TOOL Modlfiotlons for Testable Inlet <br /> Ensure that the polypak seal Is Installed on the Inlet � I <br /> -4 <br /> tube with the lip up as shown In Figure 7.Apply black STEP 9A:INSERT 7150-TOOL OVER INLET TUBE I <br /> moly grease to the polypak as shown.Make sure cover- To install the 71 SO-TOOL(sold separately)over the inlet <br /> age is completely around the polypak seal. tube,first loosen all three knobs,so the tool can pass Tip to stop dimension must be <br /> freely over the inlet tube flange.Align the slot on the 2'10 2-1/16• <br /> Enure polypak Cable port must be in tool with the key on the Inlet tube and insert the tool <br /> lip <br /> Is up down.See Figure 9A. Figure 1 to <br /> line with float <br /> aomenel Hand STEP 12A:DRILLHOLES <br /> Inlet \7 roe slot s„m, View holes ugh- With the in, <br /> tube and 71 SO-TOOL in place,carefully <br /> Tube Fd7>Ak L knobs drill a 3/16'dlameter hole In the upper tube using the <br /> %r\• °rA drill bushing In the knob as a guide.The drill gap ispo- <br /> '�. --'r sidoned so It will bottom out against the knob after the <br /> / Figure BA bit has drilled through the upper drop tube.if the stop <br /> Testable Models Only is positloned wrong either no hole will be drilled,ora <br /> through hole could potentially be drilled through the <br /> Inlet rube.If no hole Is drilled return to step i l A and <br /> ozzzMPIy9rease SEE Q! check the stop dimension.If a hole Is drilled through <br /> around polypek the inlet tube or Into the screw hole the assembly Is not <br /> TOOL• eve salvageable.Drill(2)more holes in the two remaining <br /> F19um7 Tube knobs. <br /> SEE PAGE 9 FOR I NSTRUCTIO NS USING THE 71 SO- eas• <br /> STEP 6:INSTALL INLET TUBE TOOLC. _ <br /> Insert the Inlet tube Into the upper tube until the upper <br /> mats <br /> atsagainst the flange on the inlet tube.Ensure SEE PAGE IO FOR INSTRUCTIONS USI NG THE 7ISO- <br /> polypak isInserted evenly and stays inInlet tube TOOLCT• <br /> groove. Note:tesm61e7lSOmodeh dingwftha Rrmquimtbe I <br /> 71SO-TOOLCT .d1fied71SO-TO0Lor7lSO.TO0LC a Drill thru upper <br /> Figure 9A Figure 10A tubeony <br /> Figure 12A <br /> 7 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.