Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address:401 W. Kettleman Ln., Lodi <br /> • • . • 6. . . . • • . g • . . . . . . . . I . . . . . . . Piping Runs are estimated only. <br /> . . . . .Float&. . . Float& . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . .Chains- Chains . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 5 7 . . . . . . . . . . . . . . <br /> 2 . . . . . . 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . .Float&• Float& . . . . . . . . . . . <br /> . . . . . . .Chains. Chains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . 1. . . . . . . 3 . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TLS' <br /> . . . . . . . . . . . . . . . . . . . . .RegulPr Prem. . . . . . . . . . <br /> STPSTP <br /> 208. .208 <br /> . . . . . . . . . . . . . . . . . . . . . .Ln2000 . . . .LD2000' . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . ESa - <br /> . . . . . . . . . . . . . . . . . . . . . . X <br /> ATG . . . . . ATG <br /> 0 Q <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . q2Q . . . . . . . •460 . . . . . . . . <br /> Date map was drawn:02/12/2020 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page,with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans,spill containers, or other secondary containment areas;mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan <br /> was prepared. Page 1 of 1 05/00 <br />