My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0505342
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 8:36:07 AM
Creation date
5/20/2020 8:30:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505342
PE
2960
FACILITY_ID
FA0006725
FACILITY_NAME
NAVAL COMMUNICATION SYSTEM
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed City Sewer Pipeline 3 12 October 1994 <br /> Rough and Ready Island <br /> described. Containment must be provided such that excavated contaminated soils do not pose <br /> a threat to water quality. Contaminated ground water must be stored until adequate sampling <br /> and analyses are performed to ensure proper disposal. <br /> 4. Contingency plans to ensure adequate containment and temporary storage of contaminated <br /> soil and ground water encountered during construction activities: <br /> a. in the event of rainfall, including cover of exposed contaminated soils and storage <br /> facilities to fully contain any potentially contaminated surface runoff; <br /> b. if volumes or concentrations of excavated contaminated soil or ground water exceed <br /> those acceptable for planned methods. <br /> 5. A description of proposed disposal methods for all excavated soil and dewatered ground <br /> water. Physical parameters, such as anticipated conditions, and volumes and contaminant <br /> concentrations considered to be acceptable for the proposed disposal methods must be <br /> discussed in the Work Plan. <br /> 6. A demonstration that, once constructed, the piplines, or areas in the immediate vicinity of the <br /> pipelines, will not provide a preferential pathway or any conduit for the migration of <br /> contaminants present in soil or ground water. <br /> 7. A demonstration that project activities, both during or after completion of the proposed <br /> project, will not hinder or impede any further investigation and/or remediation activities <br /> which may be necessary to address contaminated soil or ground water encountered during <br /> construction activities. <br /> The Work Plan, including a schedule of proposed project activities, must be submitted by the City <br /> of Stockton prior to initiating any construction field work at Rough and Ready Island. If you have <br /> any questions, please call me at (916) 255-3065. <br /> KAREN A. BESSETTE <br /> Project Engineer <br /> KAB/kb <br /> cc: Mr. Ronald Weldum, Department of Public Works, Stockton <br /> Mr. Mark Madison, Department of Municipal Utilities, Stockton <br /> Mr. Gary Ingraham, Assistant Manager City of Stockton, Stockton <br /> Mr. Brad Beeman, Naval Communications Station Stockton, Stockton <br /> Ms. Lang Huey, Western Division, Naval Facilities Engineering Command, San Bruno <br /> Ms. Hortensia Muniz, Department of Toxic Substances Control, Sacramento <br /> Ms. Diane Hinson, San Joaquin County Health Department, Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.