My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0505342
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 8:36:07 AM
Creation date
5/20/2020 8:30:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505342
PE
2960
FACILITY_ID
FA0006725
FACILITY_NAME
NAVAL COMMUNICATION SYSTEM
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clayton <br /> EvV IROVME\TAL <br /> COASQL AATS <br /> 3.4 LABORATORY ANALYSIS <br /> The selected soil and groundwater samples will be analyzed using the following <br /> Environmental Protection Agency (EPA) Methods: <br /> • EPA Method 8015 for total petroleum hydrocarbons as gasoline (TPH-G) <br /> • EPA Method 8020 for benzene, toluene, ethylbenzene, and total xylenes (BTEX) <br /> • EPA Method 8015 for total petroleum hydrocarbons as diesel (TPH-D) <br /> • EPA Method 8240 for volatile organic compounds (VOC) <br /> • EPA Method 8080 for PCBs <br /> • EPA Method 418.1 for total recoverable petroleum hydrocarbons (TRPH) <br /> • EPA Method 6010 for title 22 metals <br /> Table 1 represent proposed analysis for the soil samples. The proposed analytical <br /> methods for the groundwater samples are presented in the Table 2. <br /> 3.5 REPORT PREPARATION <br /> Upon completion of the laboratory analysis, Clayton will prepare a report summarizing <br /> the findings of the investigation. A discussion of the site investigation technique, soil <br /> and water sampling, analytical results, conclusions, and recommendations will be <br /> included. <br /> 4.0 PROJECT SCHEDULE <br /> Clayton will begin scheduling the work immediately upon approval of this work plan <br /> the San Joaquin County Health Department (SJCHD). We anticipate the drilling will <br /> occur within two weeks of SJCHD approval. Well development and sampling will <br /> occur within one week of well installation. The final report will be completed within <br /> 30 calendar days after the laboratory analyses are received. <br /> This work plan prepared by: <br /> —,a- '�� <br /> Dariush Dastmalchi <br /> Geologist <br /> This work plan reviewedby: <br /> ohn F. Vargas . <br /> Supervisor, G s fences and Remediation ARE D 6E0 <br /> Western Opp ions �,� F. Vq <br /> R �O <br /> 6' <br /> July 25, 1994 `P A <br /> N0. 5046 <br /> rp .Q <br /> 3 9lF OF C A1-�F�cl� <br /> AC7IVE\5680600.WPN <br />
The URL can be used to link to this page
Your browser does not support the video tag.