My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHOOL
>
107
>
3500 - Local Oversight Program
>
PR0545674
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 9:48:17 AM
Creation date
5/20/2020 9:44:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545674
PE
3528
FACILITY_ID
FA0006039
FACILITY_NAME
MARK NEWFIELD
STREET_NUMBER
107
Direction
N
STREET_NAME
SCHOOL
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
107 N SCHOOL ST
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Aldvanced <br /> . cs r <br /> 22 February 2007. <br /> AGE-NC Project No. 97-0290 <br /> Ms. Lori Duncan <br /> SAN JOAQUIN,COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95201 <br /> Subject: Remediation Well and Monitoring Well Abandonment Work Plan Addendum <br /> LODI THEATER PROJECT <br /> 107 North School Street',Lodi;California <br /> Dear Ms. Duncan: <br /> At the request of your office,Advanced GeoEnvironmental,Inc. (AGE)has prepared the enclosed <br /> work plan addendum for the abandonment of seven ground water monitoring wells.and multiple <br /> remediation wells and piping at 107 North'School-Street, Lodi;;California. The location of the site <br /> is illustrated on Figure J. A plan of the site.is illustrated on Figure 2 and a remediation plan is <br /> illustrated on Figure 3. Table 1 provides the wells.constructiondetails. <br /> AGE has calculated the volume of the soil vapor extraction wells, SVE piping connections and the <br /> air-sparge wells and IAS piping connections, along�with the cumulative volume each well cluster <br /> to provide a target volume:for grout backfilling,46 fully abandoned the wells at the site. Table 2 <br /> provides the grout volumeaargets for the destructions of wells and network pipe volumes. <br /> i <br /> AGE proposes to abandon all wells. via .pressure-grouting. Off-site monitoring wells will be <br /> pressure-grouted in a "traditional" manner and the remediation wells will be grout from the` <br /> remediation piping terminations.Table 2 provides the well target volumes for each designated well <br /> cluster. <br /> For the remediation wells and horizontal remediation piping,grout will be pumped via the horizontal <br /> piping at the manifold. Pressure.(10-20 psi) will,be applied to the entire system for at least five <br /> minutes to ensure grout penetration into.eacli well filter pack.A minimum.target volumes.of grout, <br /> for each piping cluster will be installed into piping terminations to satisfy the well.abandonment <br /> requirements.If necessary,additional grout will be pumped through thernanifold after a short period <br /> of"stabilization". <br /> Advanced GeoEnvironmental,Inc. <br /> 8`1 'Shgw R(xad `iivckion,Giliftrnia 95215 <br /> TeleP11(')T1e(209)467-1.00 F'ax-(24 9)467-11.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.