My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHOOL
>
107
>
3500 - Local Oversight Program
>
PR0545674
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 9:48:17 AM
Creation date
5/20/2020 9:44:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545674
PE
3528
FACILITY_ID
FA0006039
FACILITY_NAME
MARK NEWFIELD
STREET_NUMBER
107
Direction
N
STREET_NAME
SCHOOL
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
107 N SCHOOL ST
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/14/2004 10:45 2094671118 AGE STOCKTON PAGE 04/04 <br /> Advanced <br /> GeoEnvironm' ental, Inc.- <br /> ,14 <br /> nc,14 September 2004 <br /> AGE-NC Project No. 970290 <br /> Ms. Lori Duncan <br /> San Joaquin County Public Health Services- Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subject: Soil Vapor Extraction Results and Modifications <br /> Lodi Theater.Project <br /> 1.07 North School Street,Lodi,California <br /> Dear Ms. Duncan: . <br /> As part of the progression of the A.dvan.ced GeoEnvironmcntal,Inc. (AGE)implemented soil vapor <br /> extraction and. air-sparging prograrn at the site, a general reduction in concentrations of volatile . <br /> hydrocarbons has been achieved(attached).11n order to determine the total remediation effectiveness <br /> AGE recommends discontinuation of SVE for a one month hiatus, followed by SVE rebound <br /> response analysis. The ana.lysis will. consist of an SVE restart in thirty days, accompanied by two <br /> SVE mon.itoring events; one at the restart and one 4$-hours foIlowi,ng the first monitoring event_ <br /> The SVE and TAS units Will Tremain at the site, while the carbon canisters for adsorption will be 1 � <br /> demobilized from the site.Any necessary modification or declination.of the San Joaquin Valley Air �< � <br /> Pollution Control District permit will be conducted. Progress and operati.oll of the vacuum blower <br /> SVE system,after the rebound response analysis will be evaluated on.a monthly basis,if necessary, h'1 <br /> Monitoring and sampling would continue as cutrently underway(monthly), if required. <br /> �w� <br /> If you have any questions or comments,please contact our office at (209)467-1,006.0 _I" kclt ( �OVA <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br /> A . <br /> William R. Little <br /> Senior Project Geologist <br /> California Registered Geologist No 7473 <br /> cc: Lodi. CC12, LLC <br /> 837 Shaw Road,Stockcon,CaliFornia 95215 <br /> Telephone(2'09) 467-1006 FAX(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.