Laserfiche WebLink
21 March 2006 <br /> AGE-NC Project No 97-0290 <br />' Page 8 of 15 <br />' sparging wells using 2-inch diameter PVC casing with a 0 020-inch slotted screen SW3 and SW9 <br /> were drilled to a total depth of 60 feet bsg with a 2 5-foot screen interval S W4, S W6,and S W8 were <br /> drilled at 25 degrees from vertical to a total depth of 66 feet bsg with a 2 5-foot screen interval SW5 <br /> and SW7 were drilled at 10 degrees from vertical to a total depth of 61 feet bsg with a 2 5-foot <br /> screen interval <br />' On 23 April 2001 ground water monitoring well MW-1 was pressure grouted and abandon in-place <br /> On 19 March 2001, five oxygen release compound (ORC) packages were installed at the site The <br />' ORC was in tube form within 12-mch sock material Two 12-inch sock packages of ORC were <br /> placed in wells MW-2, MW-4, MW-5, MW-6, and MW-7 by AGE The ORC was installed below <br /> the water table at 55 feet bsg The effect of the IAS system and/or ORC was monitored utilizing a <br /> YSI-55 dissolved oxygen meter on groundwater During each monitoring event,the depth to ground <br /> water and percentage of dissolved oxygen were measured for available monitoring wells <br /> 62 SOIL-VAPOR EXTRACTION SYSTEM INSTALLATION/OPERATION <br /> On 13 March 2000,a King,Buck/Hasstech(KBH)thermal oxidation soil-vapor extraction unit was <br /> delivered to the site by AGE Beginning on 09 March 2000, setup of the extraction network system <br />' was initiated with installation of the electrical power source and the natural gas line <br /> The SVE network was installed connecting wells VW-1 through VW-6 and the SVE unit using <br /> 2-inch diameter Schedule 40 PVC piping and 2-inch gate valves to control flow from individual <br /> wells The piping was placed above ground <br /> A 3-inch network manifold was constructed and connected to the SVE unit An in-line Dwyer 300 <br /> flow meter was installed in the 3-inch influent line into the SVE unit, this meter was monitored <br /> monthly to calculate the influent rate The 3-inch piping was then routed through a moisture <br /> knockout vessel to a 5-horsepower,maximum 100 standard cubic feet per minute(scfm)blower and <br /> into the thermal oxidizer furnace An additional in-line flow meter was located at the flame arrester <br /> within the SVE to measure the total quantity of vapor processed through the SVE system <br /> The KBH thermal SVE system began operation on 19 April 2000 The initiation of the SVE <br /> operation was observed on 19.lune 2000 by representatives of the San Joaquin Unified Air Pollution <br /> Control District(APCD) On 27 February 2001,AGE conducted the demobilization of the thermal <br /> oxidation system from the site The system was removed on that date in preparation for site re- <br /> development <br /> IOn 01 March 2001, AGE installed and performed a start-up of portable carbon-based vapor <br /> Advanced GeoEnvironmental,Inc <br /> I <br />