My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
908
>
2900 - Site Mitigation Program
>
PR0536958
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 12:15:40 PM
Creation date
5/20/2020 11:07:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536958
PE
2950
FACILITY_ID
FA0021221
FACILITY_NAME
SCOTT AURORA INC
STREET_NUMBER
908
Direction
E
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
15130001
CURRENT_STATUS
01
SITE_LOCATION
908 E SCOTTS AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. PROJECT HEALTH AND SAFETY TEAM: <br /> Team Members(list) <br /> Project Manager: Lia Holden <br /> Public Information: Lia Holden,Suzanne McClurkin-Nelson,William McDonald <br /> Antea Group on-site Personnel:(On-site personnel Renee Ransom <br /> are responsible for Antea Group site health and <br /> safety.) <br /> Antea Group Site Safety Officer: Renee Ransom <br /> PROJECT TEAM TRAINING RECORDS <br /> Name 40 Hr Training Date 8-Hr Refresher Date Site Supervisor e-Railsafe and <br /> Training Date Contractor Onrail <br /> Training <br /> Lia Holden 07/2004 03/2012 02/2008 11/2011 <br /> Renee Ransom 02/2009 03/2012 03/2011 11/2011 <br /> ADDITIONAL UPRR REQUIRED TRAINING <br /> e-RailSafe training will be completed by each person prior to entering the Site. Each employee and subcontractor shall have on their <br /> person the e-RailSafe Identification Card,which is prominently displayed and current.Subcontractors visiting the Site for a short <br /> time period may have the e-RailSafe requirement waived upon approval of the UPRR Environmental Site Manager's approval. <br /> F. PERIMETER ESTABLISHMENT: <br /> Map/Sketch attached: YesNo Site secured: Yes No <br /> Perimeter identified: YesIsNo Zone(s)of Contamination identified: Yes No X <br /> Prevailing wind direction,if known: <br /> EMERGENCY MEETING SITE: To be determined at start of each work day and dependent on wind direction. <br /> EVACUATION ROUTES/PROCEDURES: To be determined at start of each work day and dependent on wind direction. <br /> G. WORK ZONES: <br /> An exclusion zone, contamination reduction zone and support zone will be identified for each site or site activity. The Exclusion Zone <br /> will be marked with yellow CAUTION tape, barricades and\or cones (each cone must be a minimum of 3-ft in height-not including the <br /> flag extension, total min. 42-inches), as needed. No person will be allowed in the exclusion zone or contamination reduction zone <br /> without approval from the Antea Group Site Safety Officer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.