Laserfiche WebLink
Drilling and Excavating Health and Safety Guidance Procedures <br /> PREP: <br /> • Prior to conducting any subsurface work, a markout must ALWAYS be called in (approximately three working days before field <br /> work is scheduled-depending on the area). In some areas, not all markouts are performed by the"Call Before You Dig System". <br /> A Markout tracking sheet should be used. This will need to get filled out whenever a markout is called in. There will be an area <br /> where you will need to fill in the utilities contacted and identify utilities that are not listed. When a utility is not listed,you will <br /> need to contact that utility directly and obtain maps and/or get them to markout the property. <br /> • Always search the file and request the client search files for an as-built of the station/facility. <br /> WHEN ON SITE: <br /> • Subcontractors are required to perform an on-site inspection of their heavy machinery each day prior to the start of fieldwork. <br /> The Antea Group Site Safety Officer(SSO)will observe the inspection. Any safety concerns identified by the subcontractor must <br /> be addressed prior to the use of the equipment. During the inspection, the subcontractor must verify that all rig/vehicle kill <br /> switches are working properly. Antea Group employees on-site must be informed of the location of the kill switches and how to <br /> operate them. <br /> • As part of your on-site health and safety meeting, walk the site with the drillers and identify possible boring locations (make <br /> sure the locations shown on the work plan/site plan are in areas free of utilities/subsurface structures). Make sure all utilities <br /> have been marked out properly. It is your responsibility for our client to ensure all boring locations are clear of utilities prior to <br /> drilling. Often "as-builts"are incorrect or not available. <br /> • Attempt to determine how all utilities are running. For the most part, utilities can run anywhere and can bend and twist in any <br /> direction but,there are a few basic things to keep in mind. Usually water and sewer lines will run to a bathroom. Electrical will <br /> run in between on-site lights, the kiosk and SS building. Storm water drains usually tie into one another and you can get a <br /> general idea of how they run by looking into them and seeing what direction the line is going. Obviously any cut outs in the <br /> asphalt should be avoided, especially if observed around the USTs (often, leak detection is an afterthought and is added <br /> following the completion of the service station rebuild and its location is obvious due to a continuous cut out in the asphalt <br /> around the tank field). <br /> • WE SHOULD NOT DRILL OR EXCAVATE WITHIN TEN FEET OF THE TANK FIELD, USTs OR PUMP ISLANDS. IN ADDITION, DO NOT <br /> DRILL IN BETWEEN THE PUMP ISLAND AND THE TANK FIELD. Should drilling be required within Ten feet of the above noted <br /> systems,an"air knife"should be utilized to a depth of at least ten feet below grade surface(bgs). Drilling within five feet of the <br /> above noted systems will require the station and tank systems to be shut down. It may be helpful to open up tank field <br /> manways and identify the general direction that the product lines are running. <br /> • ALWAYS HAND or AIR EXCAVATE (110% the width of the proposed hole) TO AT LEAST FIVE FEET bgs. If you are going in the <br /> same location as a previously installed point and the diameter of the new boring/well is larger, you must hand auger. In <br /> addition, if you didn't advance the "old" boring yourself, you can't assume that it is a safe drilling location. Refusal may have <br /> been encountered in the"old" location. If refusal with the hand auger is encountered prior to five feet, move to a new location. <br /> If you make three attempts without success, call office to discuss alternatives. If you can't reach the PM contact your UM for <br /> further instruction. <br /> • If you encounter pea-gravel while excavating STOP. Call the Antea Group PM for further instruction. Utilities or USTs may be <br /> present. <br /> • If you hit/damage any utility/subsurface feature IMMEDIATELY contact the office for further instruction. If you can't reach the <br /> PM contact your UM for further instruction. Also contact your HSE Sr.Specialists. <br /> L.SUBCONTRACTOR SHSPs <br /> All subcontractors of Antea Group shall be responsible for the development and implementation of their own SHSP to cover duties and <br /> hazards specific to that subcontractor's area of expertise or on-site functions. Subcontractors are given the opportunity to review Antea <br /> Group's SHSP,and must sign the document,prior to the start of on-site work. <br /> 15 <br />