My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
433
>
3500 - Local Oversight Program
>
PR0545678
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 11:34:32 AM
Creation date
5/20/2020 11:22:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545678
PE
3528
FACILITY_ID
FA0005843
FACILITY_NAME
MASONITE CORPORATION
STREET_NUMBER
433
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14704044
CURRENT_STATUS
02
SITE_LOCATION
433 W SCOTTS AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> Well Installation Report <br /> MASONITE (former Prem Dor) <br /> 433 West Scotts Avenue, Stockton, California <br /> 1.0. INTRODUCTION <br /> At the request of Mr.Tom Crawshaw of Masonite International,Advanced GeoEnvironmental,Inc. <br /> (AGE)has prepared this well installation report for the property located at 433,West Scotts Avenue, <br /> Stockton, California(site). The scope of work included 1)the soil sampling of two borings and the <br /> installation of two ground water monitoring wells; 2) well development; 3) well-head survey; <br /> 4) waste soil disposal and 4) preparation of this report. <br /> The site and the surrounding area are illustrated on Figure 1. On-site structures and monitoring well <br /> locations are illustrated on Figure 2.Additional site background information and historical analytical <br /> soil and ground water sample results are providedin.Appendix A. <br /> 2.0. SUMMARY OF SERVICES PROVIDED <br /> Two ground water monitoring wells were installed at the site on 19 March 2008 to further delineate <br /> the hydrocarbon-impacted ground water at the site. A summary, of the well installation activities <br /> include: <br /> • The collection of soil sampling from two pilot soil boring for the installation.two ground- <br /> water monitoring wells; <br /> • Development of the two groundwater monitoring wells;, . <br /> • A well-head survey; <br /> • Disposal of soil cuttings generated during well installation. <br /> 3.0. PROCEDURES <br /> The field work was performed in accordance with procedures outlined in the AGE-prepared <br /> Additional Site Assessment WorkPlan dated 14 December 2007,which were modified and approved <br /> by the San Joaquin Environmental Health Department.(EHD)in their letter dated 07 November 2007 <br /> (Appendix B).The work was performed in accordance with the Regional Board and EHD guidelines <br /> for the subsurface investigation of underground storage tank(UST) sites. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.