Laserfiche WebLink
f. If floor drains are required for the existing shop and/or future truck wash, they must be <br /> plumbed through a sand/oil separator and discharged to an above-ground system <br /> approved by the Environmental Health Division. This system must be designed by a <br /> registered engineer. If the above-ground holding facility has to be emptied, the contents <br /> will have to be analyzed for any hazardous material. Specific test requirements can be <br /> obtained from the Environmental Health Division. <br /> NOTE: On October 1, 1992, the San Joaquin County Planning Commission approved UP-92-27 subject <br /> to the Conditions of Approval listed above. <br /> Conditions of Approval - 3 - UP-92-27 <br />