Laserfiche WebLink
11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. Soils report is being done and will be provided to you when complete. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: Domestic well, Waterloo - Morada Fire Department <br /> b. Sewage Disposal: Septic tank and leach field <br /> C . Storm Drainage: To be provided on site (detention pond) <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : <br /> The above services will be provided for on site or provided to site <br /> y the k'airchlid industriaiPark. <br /> d. Natural Gas : P G & E <br /> e . Electricity: P G & E <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> Hardaway Road which is a private road. <br /> g . Fire: Distance to nearest fire station:3 miles <br /> h . Schools: Linden Unified <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> A detention pond will be excavated generating approximately 8,000 cubic <br /> yards which will be used to grade the building pad. All cuts & fill will <br /> be on site. There will be no vegetation removal or alterations to existing <br /> drainage. <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> 40 employee autos, 10 - 15 trucks/day, 7 forklifts (propane) . <br /> Types of emissions and sources associated with project <br /> See above (vehicles only) <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project NA <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> NONE <br /> Irrigated Not irrigated <br /> Site Approval Application - 7 - ( 6/86 ) <br />