My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003362
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
N
>
0
>
2600 - Land Use Program
>
SA-89-22
>
SU0003362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 1:38:46 PM
Creation date
5/20/2020 2:56:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003362
PE
2633
FACILITY_NAME
SA-89-22
STREET_NUMBER
0
STREET_NAME
N/S HARDWAY W/NAVONE
ENTERED_DATE
11/7/2001 12:00:00 AM
SITE_LOCATION
N/S HARDWAY W/NAVONE
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ APPLICATION PROCESSING <br /> ENVIRONMENTAL The County will decide if the proposal will have an <br /> REVIEW adverse effect on the environment. If there are no <br /> adverse effects, the application will be processed. <br /> If there are potential adverse effects, further <br /> environmental review will be required. This may <br /> extend the processing time. <br /> REFERRALS AND Staff will refer the application to any County <br /> APPROVAL departments , other agencies , and surrounding property <br /> owners affected by your proposal . At the end of a <br /> review and referral period of about 4 weeks, the <br /> Planning Director will approve your application if <br /> he can make the required findings . If the Director <br /> cannot make the required findings , the application <br /> will be denied. <br /> FINAL APPROVAL The action of the Director can be appealed to the <br /> Planning Commission. This action is final unless <br /> appealed. For further information on the- length of <br /> the appeal period, contact the Planning Staff . <br /> ❑ OBTAIN ANY PERMITS NECESSARY TO START YOUR PROJECT <br /> The Planning Division will send you the permit giving the final action <br /> and listing all conditions , if approved. Obtain any other required <br /> permits and start your project. <br /> 1. In addition to the Site Approval site plan, an Improvement Plan may <br /> be required by the Public Works Department as a condition of appro- <br /> val. This is an engineered plan showing drainage, grading, access <br /> and circulation/parking details. <br /> ❑ FINDINGS REQUIRED FOR APPROVAL <br /> For your information, the following findings must be made before the <br /> application can be approved. <br /> 1. The establishment, maintenance and operation of the use does not <br /> conflict with the General Plan. <br /> 2 . Adequate utilities , access roads, sanitation, drainage and other <br /> necessary facilities have been provided and the proposed improve- <br /> ments are properly related to existing and proposed streets and <br /> highways . <br /> 3 . The property involved is of adequate size and shape to accommodate <br /> the proposed use and all yards , building coverage, setbacks , <br /> parking areas and other requirements of this Title . <br /> 4 . Issuance of the permit will not be significantly detrimental to <br /> the public health , safety, or welfare or injurious to the property <br /> or improvements of adjacent properties . <br /> Site Approval Application - 2 - ( 6/86 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.