Laserfiche WebLink
C ' <br /> 1 <br /> OPERATION CHARACTERISTICS <br /> Describe any processing to be done on-site: None <br /> List type of equipment or machinery used in the project and method <br /> of excavation: Scrapers , caterpillars , loaders and trucks . <br /> List equipment or processes used in this project that generate air <br /> pollutants or required an Air Pollution Control District permit : <br /> Scrapers , caterpillars , loaders and trucks . <br /> List any operations which will cause noise or vibration: None <br /> Describe any trees or vegetation be removed: The existing old <br /> Olive Orchard will be removed. <br /> List all noxious weeds on the site: None <br /> Where will materials be stockpiled: Stockpiling will not be <br /> necessary. <br /> REHABILITATION PLAN <br /> Proposed final use of the site (crops, irrigation methods, etc . ) : <br /> Row crops <br /> Will the topsoil be replaced? Yes No Q <br /> If no, attach a soils report prepared by a qualified soil scientist . <br /> Describe any changes in irrigation systems : Flood irrigation will <br /> be used. <br /> Describe measures to stabilize slopes: Slopes will be at a <br /> maximum slope of 3 : 1 and will be stabilized with natural <br /> vegetation. <br /> Grading Excavation - 9 - (7/84 ) <br />